Laserfiche WebLink
• Proposed Permanent Cessation Phase Monitorino Program <br />During the permanent cessation phase of the operation ground water monitoring will <br />be reduced to quarterly water level and field measurements (pH, temperature and <br />conductivity) on wells D-IA and D-2A located near the toe of the refuse pile. <br />Moniioring on ground water monitoring wells M-1, M-3, and M-4 will be discontinued. <br />Monitoring on piezometers PZ-2 and PZ-3 located in the #3 Mine and Loadout wells <br />#1, #2 and #3 were eliminated in previous revisions to the application. <br />i <br /> <br />3-61 <br />June 1998 <br />RN -O 3 <br />`f•2. -a a <br />__ ___!, <br />= -- -~~ <br />