Laserfiche WebLink
(Note: Text for Coal Handling System components moved to pages 2.05-24 through 38) <br />• EnaineerinQ Trailer <br />An additional engineering trailer is planned to be placed on the south side of the existing engineering trailer. This <br />new trailer will be ]4 feet wide by 70 feet long and approximately 20 feet high of composite wood and metal <br />construction. No plumbing for water or sewer is associated with this trailer, but it will be wired for electrical. The <br />building will be removed when no longer needed. <br />Trainin¢ Facility <br />The intended location of the trailer is on the southeast comer of the existing engineering trailer. This new facility <br />will be approximately 28 feet wide by 61 feet long and 16 feet high with the foundation. The building is a <br />composed of a wood and metal constmction. A wooden walkway will be built on both the front and back of the <br />trailer with footages of 5 feet by 40 feet and 5 feet by 20 feet. One ramp and one stairway, totaling 350 cf, will be <br />constmcted for the walkway entrances. This potential site will be located on a distwbed area, which already <br />maintains a stable topsoil stockpile. <br />Approximately 46 CY of concrete will make up 192 cf of the footer, 1008 cf of the foundation stem walls, and 7.5 <br />cf of the 6 pads for the adjustable piers. There will be a sewer line buried 2 to 4 feet deep from the proposed <br />• <br />• <br />TR06-53 2.05-61 05/03/06 <br />