Laserfiche WebLink
NMD (Panels 17 Right through 23 Right) (PR 03-06) <br />The same mining method utilized in the southern half of the NMD will be used to extract coal from the northern <br />half of the NMD. The existing surface facilities, including the EMD ventilation site, will be used for mining of coal <br />in this part of the NMD pernut area. <br />~.65 =J (21 Operation Description <br />(a) Surface minine A detailed narrative description and appropriate man(s) Paced in <br />accordance with 2 10 describine the land to be affected within the permit area according to the pronosed seouence <br />of mining and reclamation Each narrative and/or map shall include a detailed timetable sufficient to describe the <br />various miningphases proposed by the applicant the maximum acreaee pronosed for each phase of the operations <br />within the Hermit area must be specified. <br />RESPONSE <br />No surface mining is planned in this application. Therefore, the requirements of this Section are not applicable to <br />the Foidel Creek operation, nor the Fish Creek Tipple operation <br />(b) Undereround mininP A detailed narrative and anpropriate man(s) prepazed accordine to the standards of <br />2 10 sufficient to describe all pronosed surface disturbances to be associated with the undereround minine <br />activities within the Hermit area Each operation plan shall include a narrative, cross-sections, man(s), and <br />timetables) sufficient to describe the azeal extent of the proposed undereround workines and the stratum to be <br />affected. <br />r ~ <br />~J <br />C~ <br />TROS-52 2.05-11.1 05/16/06 <br />