Laserfiche WebLink
• TABLE OF CONTENTS (continued) <br />Impact Analysis ........................... ... 2.05-79 <br />Minimization of Fish and Wildlife Impacts .......... ... 2.05-82 <br />(3) Protection of the Hydrologic Balance ............... ..2.05-83b <br />Water Quantity ........................ ..2.05-83b <br />Ground Water ........................ .. 2.05-84 <br />Contour Mining Cuts & Fills ............... ..2.05-83b <br />Fills ............................... ..2.05-83c <br />Points of Compliance .................... ..2.05-83c <br />Surface Water .............................. ..2.05-100 <br />Lorencito Coal Company -Monitoring Plan .......... ..2.05-105 <br />Surface Water ......................... ..2.05-105 <br />Springs and Seeps ...................... ..2.05-106 <br />Stock Ponds .......................... ..2.05-108 <br />Alluvial Wells ......................... ..2.05-108 <br />(4) Protection of Public Parks and Historic Places ......... ..2.05-110 <br />(6) Subsidence Survey, Subsidence Monitoring, Subsidence .. ..2.05-111 <br />Historic Mining ........................ ..2.05-120 <br />• 2.06 REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES <br />OF MINING ........................................... 2.06-1 <br />2.06.1 SCOPE ....................................... 2.06-1 <br />2.06.2 EXPERIMENTAL PRACTICES MINING ................ 2.06-1 <br />2.06.3 MOUNTAINTOP REMOVAL MINING ................. 2.06-1 <br />2.06.4 STEEP SLOPE MINING ............................ 2.06-1 <br />2.06.5 PERMITS INCORPORATING VARIANCES FROM <br />APPROXIMATE ORIGINAL CONTOUR RESTORATION <br />REQUIREMENTS FOR STEEP SLOPE MINING ........... 2.06-2 <br />2.06.6 PRIME FARMLANDS ............................. 2.06-2 <br />2.06.7 VARIANCES FOR DELAY IN CONTEMPORANEOUS <br />RECLAMATION REQUIItEMENTS IN COMBINED <br />SURFACE AND UNDERGROUND MINING OPERATIONS ... 2.06-2 <br />2.06.8 SURFACE COAL MINING AND RECLAMATION <br />OPERATIONS ON AREAS, OR ADJACENT TO AREAS, <br />INCLUDING ALLUVIAL VALLEY FLOORS ............. 2.06-2 <br />2.06.9 AUGURING .................................... 2.06-5 <br />2.06.10 COAL PROCESSING PLANTS AND SUPPORT FACILITIES <br />NOT LOCATED WITHIN THE PERMIT AREA ............ 2.06-5 <br />2.06.11 IN SITU PROCESSING ACTIVITIES ................... 2.06-5 <br />2.06.12 SURFACE COAL MINING AND RECLAMATION <br />. OPERATION REQUIREMENTS INVOLVING THE REMOVAL <br />OF COAL REFUSE PILES .. 2.06-5 <br />vi (revised 10-8-O1) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />