Laserfiche WebLink
CIRCES Cost Estimatin Software <br />BULLDOZER WORK <br /> <br />PROJECT IDENTIFICATION <br />'ask u 002 State Caaauo Pormilgobt+ M-2005051 <br />Data 1013(!2005 County Cnalloe AbbreviaUOn:none <br />User : ESC Site : Rrver Park Re: realion Access Filename MOb f 002 <br />Agancy or organization name : Dh1G <br />Permit or other j~,b action :Mew 1 f0 Prarmif <br />rash::esr:nptionReplace6"topsoil --- ----__--- ---- <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine ~ Cal D8R Series /! - 8SU <br />Horsepower : <br />310 <br />Blade typo :SemrUnivarsal <br />Attachment no 1 : ROPS CaD Shin basis : 1 per dey <br />Attachment no 2 ~ 3-shank ripper <br /> Data source : (CRG) <br />Utilization `Yo <br />Cost Breakdown; Ownership cosUhour : S48.82 NA <br />Operating cosUhour : 566.09 100 <br />Rippot op. cosUhour : SO 00 0 <br />Operator wsUhour: 531J6 NA <br />Total unit cosUhour : $146.70 Total Ileol cosbhour $146.70 <br /> <br />MATERIAL QUANTITIES <br />Inib.d Swell Loosa <br />volume 3.000 CCY }actor : 1.115 volume : 3,345 LCV <br />Source of asUmated volume :Mining Plan Map <br />Suun;u of rrstunaU:d swell latter : CA7 Nanda~k- Eorth Loom _ <br /> <br />IOpCpndiUOn Cprrect{~n Factorg <br />ION ~u~ <br />, <br />HOURLY PRODUCT <br />Operelor skill : 0 75 (avgJ <br />Avarege push distance : 500 feet Material consistency : 1.00 (Cnt HB) <br />Unadjusted hourly production : 129.7 _LCY/hr Dozing mathod : 1.00 (yon l <br />- Vlsibdily : 1 UO (avgJ <br />Materal consistency descriplfon : Job efficiency : 0,83 (ishrlUday) <br />Consardated sfockprlu Spoil pile 0.80 (Ind-rn <br />Push gradient 1. f f (Cet HB) <br />Avarage push gradient : 5.00 % (negJ ~ Attituda 1.00 (Cat H8) <br />Average site altitude : 7,840 lost Material wa~ght : 1.10 (Caf HB) <br />Btado type : 1.00 (S/SU/U) <br />Material weigh : 2.100 Ibs1LCY Nel correction 0.61 <br />Weight description <br />Adjusted unit production . <br />78.88 <br />LCYfhr <br />Eedh • Loam <br />Adjusted Ileac produrhon : 78,88 LCYfhr <br /> <br />JOB TIME AND COST <br />Fleet size t Dozor(s) Total job lima 42.41 Hours <br />Unit cost S 1 860 iLCY Total job cost $6, 221 <br /> <br />