Laserfiche WebLink
RECLAMATION PLAN EXHIBIT F (coNr.) <br />be located in areas where disturbances by ongoing mining operations <br />will be at a minimum, i.e., along setbacks on the pit perimeter. <br />The topsoil will be handled as little as possible until it is <br />replaced onto disturbed ayes. The operator will take measures <br />necessary to insure the stability of the replaced topsoil on graded <br />slopes and spreading it as evenly as possible. Fertilizer and <br />other soil amendments will be used as discussed in this plan. <br />RECLAMATION TIMETABLE <br />Reclamation will begin once enough area has been opened so <br />that any reclamation completed will not be disturbed as mining <br />progresses. This may take 5 or more years depending on the <br />economic conditions in the area and the amount of material mined. <br />The operator anticipates approximately 45$ of the total mined land <br />will be reclaimed by the time mining is completed. We expect <br />reclamation to be complete on most of the east and south slopes by <br />the time the north slope is ready for recoiling. A portion of the <br />floor area will also be complete, but the area under the <br />plant/stockpile area will still need work. Shortly after mining <br />ends, all recoiling and revegetation will be complete. The area <br />will then be monitored for success of revegetation until it is <br />released by the Board. The operator estimates that this will <br />happen 3 to 5 years after mining is completed. <br />If revegetation problems occur before release, an analysis of <br />the site will be made and the area will be revegetated again as <br />necessary. The seed mixture and rates may be revised as needed to <br />complete reclamation, if a modification is required, the Division <br />will be notified in the next annual report after the change was <br />made. This gives us the most flexibility to complete reclamation <br />successfully. <br />RECLAMATION TIMETABLE <br />~ Acres ± ~ <br />Years Total <br />Area Revege- <br />tation Road Undis- <br />turbed <br />3-5 40.32 32.85 0.78 6.69 <br />16 <br />