Laserfiche WebLink
<br />Resolution No. 1987-23 <br />Page 5 <br />2. All verbal and written representations of the Applicant or the <br />Applicant's representatives are hereby made conditions of .is approval. <br />3. T},e operations of the Willow Bend Sandpit s},all be, at all times, <br />in compliance wit}, U,e findings of this Board as stated he sin above. Speci- <br />fically, at no time s},all t},e extractive operations go bey nd the actual sand <br />bar area located wit},in t},e boundaries of the affected min ng area as stated <br />on the land use application, consisting of about 1.0 t 1.5 acres. T},e <br />operations s}.all consist of only one meditin-sized front- nd loader and, at <br />any given time, only one medium-sized dump tnick, of ten o twelve yards of <br />hauling capacity, shall be loaded on tk,e site. There i to be no stock- <br />piling, crus},ing, or processing of any materials at tl,e si a nor any storage <br />of equipment, machinery, or vehicles, except for t},e front end loader during <br />actual mining operations, at t},e cite. All equipment an vehicles located <br />and operated on t}.e site s}.all Dave fully operationa muffler devices <br />attached at all times during operation. T},e hours of eration shall be <br />confined to daylight, and in no case earlier tt,an 7:30 a.m. nor later than <br />6:30 p.m., Monday through Saturday. There is to be no c shing or material <br />processing operations conducted on the site at any time. All }.aiding and <br />equipment movement is to be confined to the mine area and t e haul road to <br />U. S. Hwy. 550, The haul road to U. 5. Hwy. 550 shall be g aveled and dust- <br />retardant applied, as necessary, to control fugitive dust T},e operator is <br />to use appropriate techniques and materials to control y fugitive dust <br />whit}, may be generated by t},e operation so as to preve t any detectable <br />levels of particulates from leaving the site. There are t be no operations <br />on t}ie site during periods of t,igh water or during perio s when t},e Animas <br />River is at flood stage. Any equipment or machinery pr sent on tl,e site <br />shall be promptly removed during periods of high water or when flood danger <br />is present. There shall not be any encroachments, fill structures, or <br />substantial improvements located witt,in t},e floodway of tl,e Animas River. <br />4. Periodic Review and Enforcement: This land use approval is <br />expressly contingent upon and subject to the operator' receipt of and <br />compliance with all required state permits or approvals, ncluding, but not <br />limited to, the permit for the proposed operation required from the Colorado <br />Mined Land Reclamation Board. Should t.},e Colorado Mined Land Reclamation <br />Board or any ot},er state agency, whose permit or approval i required for the <br />Sandpit operation, suspend or revoke sttch permit or approv 1 for the opera- <br />tion, the County's land use approval shall be deemed suspen ed or revoked, as <br />appropriate. T},e operation of the Sandpit shall be reviews by this Board on <br />a biannual basis to determine if t},e operation is in co pliance with t},e <br />terms and conditions of County land use approval set fort in t},is Resolu- <br />tion. Such biannual review shall be held within the ninet (90) day period <br />preceding such anniversary date. Any written allegations at the Sandpit is <br />operating in violation of the terms and conditions of pproval shall be <br />referred to t},e County planning staff for investigation. The County staff <br />sk,all promptly investigate any such written allegations con erninq violations <br />and report their findings to this Board. <br />