Laserfiche WebLink
<br />MINED LAND n~ <br />Department of Natural Resourcr. <br />13t3 Sherman St.. Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />Fnx.303 832-8106 <br />September 21, 1990 <br />Mr. R.A. Everist, Jr. <br />Andesite Rock Company <br />1746 Cole Blvd., Suite 225 <br />Golden, Colorado 80401 <br />Re: M-88-048, Carr Gravel Resource, Permit Issuance <br />Dear Kr. Everist: <br />of ~~~ <br />,~4/~/__'' ~,4,y <br />~~~ o <br />111 ~ r a <br />~.~~;t """Y~ . <br />~ le'/0 ~ <br />Roy Ramer. <br />Govemrr <br />Fretl R. Barra. <br />Dwision Director <br />On September 22, 1990, the Mined Land Reclamation Division found Andesite Rock <br />Company to have satisfied the applicable requirements of C.R.S. 34-32-101 et <br />seq. for obtaining a mining and reclamation permit. Therefore, a permit is <br />being issued. Two signed originals of the permit have been executed. We have <br />kept one copy for our files and are enclosing one copy for your use. Please <br />read the terms of the permit. It is your responsibility to comply with all of <br />the terms of the permit. As a reminder, here area few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us ro <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1,10 to Conversions. <br />3. On your permit anniversary date each year, September 22, you must submit <br />an annual fee and an annual report td us. The annual fee for this permit is <br />$350.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />., <br />Since~r 1' <br />~~ . <br />!~ ~~, <br />Director <br />FRB/ dl m <br />Enclosures <br />8824G <br />~II II~II~II~II~~ II~ <br />999 <br />J <br />