Laserfiche WebLink
• <br />Table 17-28 <br />Peak Discharge, Runoff Volume, Peak Sediment Concentration <br />and Sediment Yield Predicted using SEDIMOT II for both <br />Pre- and Postmining Conditions in the Watershed Above Pond 007 <br />• <br /> <br /> Peak <br />Peak Runoff Sediment <br />Discharge Volume Concentration <br />(cf s) (acre-ft) (mg/1) <br />Premining 23.5 5.80 145,146 <br />Postmining 8.57 3.05 89,728 <br />17-87 <br />Sediment <br />Yield <br />(tons) <br />730 <br />251 <br />Revised 04/11/88 <br />