Laserfiche WebLink
Table 17-4 <br />• Simulated Average Daily Pit Inflow (ft3/day) for <br />the Coal and Overburden Aquifers for Each Year of Mining <br />Year <br />Overburden <br />Coal <br />1 876.2 379.3 <br />2 869.8 272.3 <br />3 1395.5 284.6 <br />4 2618.4 342.1 <br />5 5228.9 376.7 <br />*The vertical hydraulic conductivity used was 10-7 cm/sec. <br />• <br /> <br />17-26 Revised 04/11/88 <br />