Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />S~. 2.07. GE~IERAL REQUIREMENTS FOP. COAL EY,PLORATIO~ DocDate:12/17/2001 <br />• <br />2.02.1 Scope <br />The scope of this Section establishes requirements for coal exploration <br />outside the approved permit area. <br />Mt. Harris plans only to conduct coal sizing ar.d loadout operations at <br />i is faci 1 i ty. Since no coal ~ wi 11 be mined , Mt. Harri s wi 11 not need <br />coal exploration at its operation. Therefore, this Section is not <br />applicable. <br />• <br /> <br />2.02-1 <br />