Laserfiche WebLink
SEDCAD 4 for Windows <br />Cmm~inFf ~°°A Pamnlo ~ RrFUn6 <br />Structure #5 (Null) <br />SIIPM-14 <br />Structure #7 (Null) <br />SIIPM-12 LOWER <br />Structure #9 (Pond) <br />POND 004 <br />Pond Inputs: <br />12 <br />Initial Pool Elev: 6,950.50 <br />Initial Pool: 4.27 ac-ft <br />*Sediment Storage: 9.09 ac-ft <br />Dead Space: 20.00 <br />Pond Results: <br />*Sediment capacity based on Average Annual R of 10.0 for 500 year(s) <br />Emelyencv Soillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />6 950.15 40.00 4.00:1 4.00:1 12.00 <br />Peak Elevation: 6,950.52 <br />H'graph Detention Time: 0.00 hrs <br />Pond Model: CSTRS <br />DewaterTme: 0.86 days <br />Trap Efficiency: 71.72 <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br /> <br /> <br />Elevation <br />Area <br />(ac) <br />Capacity <br />(ac-ft) <br />Discharge <br />(cfs) Dewater <br />Time <br />hrs <br />( ) <br />6,948.86 2.350 0.000 0.000 Top of Sed. Storage <br />6,949.00 2.400 0.334 0.000 <br />6,949.50 2.553 1.572 0.000 <br />6,949.80 2.647 2.352 0.000 <br />6,950.00 2.710 2.886 0.000 <br />6,950.15 2.745 3.297 0.000 Spillway #1 <br />6,950.50 2.826 4.272 7.207 20.20 <br />6,950.52 2.830 4.322 7.568 0.90 Peak Stage <br /> <br /> <br /> <br />Filename: Pond 004 TR-42 Emergency Spillway Only 09_07.sc4 <br />Printed 08-29-2007 <br />TR-42 7-6c.1B-12 Revised 09/07 <br />