Laserfiche WebLink
1.0 ROAD MODIFICATIONS AND ENTRY PORTALS <br />1.1 GENERAL <br />1.1.1 ROAD MODIFICATIONS AND ENTRY PORTALS SHALL. BE DEVELOPED IN ACCORD- <br />ANCE WITH THE CONSTRUCTION DRAWINGS AND ALL NOTES CONTAINED <br />THEREO <br />1.2 ROAD MODIFICATIONS AND TEMPORARY RAMP CONSTRUCTION <br />1.2.1 THE EXISTING MINE ACCESS ROAD SHALL BE RELOCATED AS SHOWN ON THE: <br />CONSTRUCTION DRAWINGS. <br />1.2.2 BENCHES SHALL. RE: CONSTRUCTED AT INTAKE: PORTAL.. AND RETURN PORTAL, AT <br />THE ELEVATIONS SHOWN ON THE CONSTRUCTION DRAWINGS. <br />1.2.3 A TEMPORARY ACCESS RAMP TO THE BFLTLINE PORTAL SHALL BE CONSTRUCTED <br />USING A COMPACTED FILL PRIOR 10 COMMENCING EXCAVATION OF THIS <br />ENTRY. <br />1.2.4 THE FOUNDATION OF THE TEMPORARY ACCESS RAMP SHALL RE CLEARED OF ALI, <br />VEGETATION, TRASH, WEAK ZONES, OR OTHER MATERIAL THAT COULD INFLU- <br />ENCF THE STABILITY OF' THE: FILL. <br />1.2.5 THE FOUNDATION OF THE TEMPORARY ACCESS RAMP SHALL BE, I,F.VELEI) PRIOR <br />TO PLACEMFNT OF ANY FILL. <br />1.2.6 FILL. FOR Till' 'TEMPORARY ACCESS RAMP CAN HI Dil'CAINEA) FROM ROAD EXCA- <br />VATION. INITIAL DEVFL.OPM!4'C OF 'TIIF: INTAKE: AND HFTL'HN KNTRIES, O1( <br />OTHFR SUTTAB!,L: APPROVED SOURCES. <br />1.2.7 TEMPORARY ACCESS RAMP FL LI, SRAI I BF SPREAD IN APPROX I MATFLY HOR I - <br />ZONTAi LAYERS NOT EXCFEDIN6 12 INCHES IN LOOSE' THICKNESS AND SHALL <br />HE COMPACTED UNIFORMLY RA' ROUTING CO•:STRCCTION EQUIPMENT OVEP THE <br />SURFACE: OF THE FILL. OR RY OTHER MEANS AS NECESSARY FOR ENSURIN), THE <br />REQUIRED DEGREE. OF COMPACTION. <br />1.2.8 AIA, COMPACTED SOIL FILL IN THE TEMPORARY .ACCESS RAMP SHALL, HAVE A <br />DRY DENSITY OF AT LEAST 95 PERCENT OF THF MAXIMUM DRY DENSITY AS <br />DETERMINED BY THE AMERICAN ASSOCIATION OF STATE' HIGHWAYS AND <br />TRANSPORTATION OFFICIALS (AASHTO) SPECIFICATION T99 -74 ( "STANDARD <br />PROCTOR ") . <br />1.2.9 THE: OVI'SLOPF OF THE: TFMPORAHY :ACCESS RAMP SHALL NOT F:XCE'FO <br />1.5(11):I(V). <br />1.2.10 SUI'CABLE BARRICADES SHALL RE INS "CALLE.D ALONG THE CREST OF THE <br />TEMPORARY ACCESS RAMP. <br />1.2.11 THE TEMPORARY ACCESS RAMP SHALL BE REMOVED AND THE GROUND SURFACE <br />REGRADED TO THE PERMANENT BELTLINE PORTAL BENCH CONFIGURATION AFTER <br />THE FIRST SEGMENT OF HAULAGE, CONVEYOR HAS BE:F,N INSTALLED. <br />.N <br />2.0 DEVELOPMENT HOCK DISPOSAL, <br />2.1 <br />GENERAL <br />3.3 <br />2.3 <br />SITE P ON REPARATI <br />3.1 <br />2.1.1 <br />ROCK PRODUCED DURING ENTRY DEVELOPMENT SHALL BE DISPOSED OF IN <br />3.3.1 <br />2.3.1 <br />ACCORDANCE: WITH THE CONSTRUCTION DRAWINGS AND NOTES THEREON. <br />3.1.1 <br />2.1.2 <br />COLLUVIAL SOILS PRODUCED DURING INITIAL ENTRY DEVELOPMENT MAY HE <br />DISPOSED OF IN THE CENTRAL PORTION OF THE DISPOSAL FILLS, USED FOR <br />3.3.2 <br />2.3.2 <br />ROCK SLOPE ENTRY PORTALS AND ROAD CONSTRUCTION, OR USED FOR OTHER <br />3.1.2 <br />APPROVED PURPOSES SUCH AS COVERIN "; ROCK FILLS. <br />COMPACTED BY ROUTING CONSTRUCTION EQUIPMENT OVER THE SURFACE OF T'HE' <br />1.3 <br />3.1.3 <br />2.1.3 <br />TOTAL, IN- PLACE, VOLUME OF EXCAVATED MATERIAL FROM THE THREE: ENTRIES <br />IS ESTIMATED TO HE 65,600 CUBIC YARDS. ASSUMING A SWELL FACTOR OF <br />2.3.4 <br />30 PERCENT, APPROXIMATELY 86,000 CUBIC YARDS OF EXCAVATED DEVELOP- <br />3.3.4 <br />THE EXISTING SURFACE DRAINAGE SYSTEM SHALI, RE DISRUPTED TO TILE: <br />MENT ROCK AND SOIL WILL HAVE TO BE DISPOSED. <br />SURFACE. DRAINAGE THE FILL SHALL RE MAINTAINED THROUGHOUT CON- <br />3.5 <br />PRIOR TO PLACEMENI' OF ANY FILL. <br />3.2 <br />2.2 <br />DISPOSAL LOCATIONS AND DISPOSAL. AREA VOLUMES <br />3.2.1 <br />2.2.1 <br />DEVELOPMENT ROCK SHALL INITIALLY HE DISPOSED OF BY DUMPING DOWN THE: <br />2.3.6 <br />INTAKE AND RETURN VENTILATION SHAFTS LOCATED ON THE EXISTING FAN <br />3.2.2 <br />DRAINAGE MODIFICATIONS SPECIFIED ON THE CONSTRUCTION DRAWINGS SHALL <br />LEVEL. THE BOTTOMS OF THESE. SHAFTS WERE PREVIOUSLY BACKFILLF.D; A <br />NO FILL MATERIAL SHALL BE PLACED ON STANDING WATER, SNOW, OR ICE.; <br />TOTAL OF 6,000 CUBIC YARDS OF USABLE DISPOSAL. VOLUME: IS ESTIMATED <br />BE COMPLETED AS QUICKLY AS POSSIBLE. 1'0 RESTORE: DRAINAGE,. <br />2.3.7 <br />TO REMAIN IN THE TWO SHAFTS. <br />COMHUSTIRLF: MATERIAL IN ACCORDANCF WITH 30 CFR 75.1711 PRIOR TO <br />3.2.3 <br />2.2.2 <br />TH!: DEVELOPMENT ROCK DISPOSAL AREA LOCATED ON THE PORTAL L,EVEI, <br />3.4.1 <br />PORTAL DEVELOPMENTC <br />BENCH HAS A CAPACITY OF APPROXIMATELY 67,000 CUBIC YARDS. <br />IT IS ANTICIPATED THAT FILi, MATEHIAL.S WILL CONSIST PREDOMINANTLY OF <br />1.4.1 <br />:3.2.4 <br />2.2.3 <br />THE DEVELOPMENT ROCK DISPOSAL :AREA LOC'ATFD ON THE F.4i)LOYEE PARKING <br />LOT HAS A CAPACITY OF APPROXIMATFLY 1 -;,000 C131C YARDS. <br />3.4.2 <br />3.3 <br />2.3 <br />SITE P ON REPARATI <br />1.2.12 <br />THE OUTSLOPE OF THE PERMANENT BELTLINE PORTAL BENCH SHALL NOT EX- <br />-- <br />- - - -TI <br />3.3.1 <br />2.3.1 <br />Boni PORTAL, I,FVFL AND P:ARKiSi LOT DISPOSAI. :ARF'AS ARE L.00ATE'D ON <br />CEED 2(H):1(V). <br />2.4.1 <br />APPROXIMAT'-,LY HORIZIINT'AL HKNC!IF.S CO \STRUCIED PHf1( , IPAI,LY WITHIN <br />SOUS!) BEDROCK. MINIMAL, FOUNDATION PREPARATION IS ANTICIPATED. <br />3.3.2 <br />2.3.2 <br />ANY POWER P)LF:S OR STRUCTURFS THAT HFQUIRE HF'L,OCATION WITHIN THE <br />FILL AREAS SH:AIJ, BF REMOVED PRfOH TO PLA E'MF:\!' OF ANY FILL,. <br />COMPACTED BY ROUTING CONSTRUCTION EQUIPMENT OVER THE SURFACE OF T'HE' <br />1.3 <br />3.3.3 <br />2.3.3 <br />'UHF SI.oPF: OF THI( FOUNDATION IN T'HF VICINITY OF THE TOF OF THE FILL <br />SHALT. NOT EXCFF'D 2.800:1(V). <br />2.3.4 <br />AN ACCESS AND CATCH BENCH SHALL.. RE.. C O\STRUCTF.D AT T'HF TOE OF THE <br />3.3.4 <br />THE EXISTING SURFACE DRAINAGE SYSTEM SHALI, RE DISRUPTED TO TILE: <br />PARKIN); LO'!' DISPOSAL AREA, AS SHOWN IN Till-: CONSTRUCTION DRAWINGS, <br />SURFACE. DRAINAGE THE FILL SHALL RE MAINTAINED THROUGHOUT CON- <br />3.5 <br />PRIOR TO PLACEMENI' OF ANY FILL. <br />MINIMUM EXTENT POSSIBLE DURING CONSTRUCTION. <br />MINIMUM <br />2.3.5 <br />ANY ASPHALT PAVING IN THE TOE AREA OF THE FILLS SHALL RE REMOVED <br />3.5.1 <br />1.3.2 <br />WHERE THE F ILA, DEPTH WILL BE L.F.SS THAN 4 FEFT. <br />2.3.6 <br />INSTALLATION OF' PRESSURE REGULATING PIPE OR ANY OTHER STRUCTURES <br />DRAINAGE MODIFICATIONS SPECIFIED ON THE CONSTRUCTION DRAWINGS SHALL <br />THAT WOULD PASS THROUGH THE FILLS SHALL RE, COMPLETED PRIOR TO <br />NO FILL MATERIAL SHALL BE PLACED ON STANDING WATER, SNOW, OR ICE.; <br />COMMENCEMENT OF FILL PLACEMENT. <br />BE COMPLETED AS QUICKLY AS POSSIBLE. 1'0 RESTORE: DRAINAGE,. <br />2.3.7 <br />EXISTING PORTALS ON THE: PORTAL LFVEI. SHALT, BE BACKF'ILLED WITH NON - <br />COMHUSTIRLF: MATERIAL IN ACCORDANCF WITH 30 CFR 75.1711 PRIOR TO <br />3.4 <br />INTO THE FILL. <br />COMMFNC'EMF:NI' OF' ROCK FILL P1 ACI :NEWT <br />3.4.1 <br />3.4.2 <br />3.5.7 <br />3.5.8 <br />3.0 RECLAMATION <br />GENERAL <br />RECLAMATION OF THE ROCK SLOPE. ENTRY PORTALS AND DEVELOPMENT ROCK <br />DISPOSAL AREAS SHALL BE PERFORMED IN ACCORDANCE WITH THE <br />CONSTRUCTION DRAWINGS AND ALL NOTES CONTAINED THEREON. <br />RECLAMATION SHALL 13E CONSISTENT WITH THE EXISTING RECLAMATION PLAN. <br />ALI, .AREAS WHICH ARE NOT MODIFIED BY THE ROCK SLOPE ENTRY PORTALS <br />AND DEVELOPMENT ROCK DISPOSAL AREAS SHALL BE RECLAIMED IN ACCORD - <br />ANCE WITH THE EXISTING RECLAMATION PLAN. <br />VENTILATION SHAFTS <br />VENTILATION SHAFTS SHALL BE BACKFA LLF.D TO THE EXISTING FAN LEVEL <br />ELEVATION WITH DEVELOPMENT HOCK. <br />ADDITIONAL ROCK OR SOIL SHALL RE USED TO MAINTAIN THE LEVEL OF THE <br />SHAFT FILL AT THE FAN LEVEL ELEVATION IF THIS IS NECESSARY DUE TO <br />SETTLEMENT OF' FILL. <br />INTERIM RECLAMATION ()F THE VENTILATION SHAFTS SHALL BE IN ACCORD- <br />ANCE WITH THE' FXISCIN(i I?F.CI.AMA'CIUN PLAN. <br />TIIF; FAN I,E.A'E'I, SHALL RF RECLAIMED UPON FINAL ABANDONMENT IN ACCORD- <br />ANCE WITH rill­ EXISTING HE:CI.AMA'I'IOS PLAN. <br />ROCK SIOPI• -ENTRY PORTALS <br />:11.1. PIPES. I'T'll ITY LINES, ETC. SI ;ALL BF REMOVED WHF:RF RE14UIRE:1) <br />BFFUHF BA( " :.FILI.IN( ;. <br />ROCK S1.0Pi INTRY PORTALS SHALI, BF HAFKFILLF.D WITH NON- COMBUSTIBLF <br />MA'rE,HIA1, FOH A MINIMUM DISTANCE OF 25 FI• :FT FHOM THE PORTAL OPENINGS <br />PE!1 :3O CFR. 75.1711 -2. <br />THE. ROCK SLOPE ENTRY PORTALS SHALL RE BACKF 11.I.F.D IN .ACCORDANCE: WITH <br />THF: RECLAIMED SLOPE. CONF'IGURA'TIONS IN "I'HI• FXISCING RECLAMATION <br />PLAN. <br />L'PON FINAL A..ANDONNFST, THE PORTAL AREAS SHALL BE RECLAIMED IN <br />A(01RDAVCE WITH THE EXISTING RECl,AMATION P!.:AN. <br />PORTAL LEVEL ROCK DISPOSAL AREA <br />THE CONFIGURATION OF CONSTRUCTED DISPOSAL FILL SHALL, BF. THE.- SAME AS <br />THE RECLAIMED CONF'IGURAT'ION, EXCEPT AS NOTED IN 3.4.2. <br />PRIOR TO FINAL RECLAMATION, THE TOP OF THE FILL SHALL BE REGRADED <br />IF NECESSARY TO ENSURE THE PERMANENT OVERLAND FLOW OF RUNOFF TOWARD <br />THE PERMANENT DRAINAGE. CHANNEL NORTH OF THE FILL. <br />SUBSEQUENT TO CONSTRUCTION OF THE FILL, FILL OUTSLOPES SHALL BE <br />REVEGETATED IN ACCORDANCE WITH THE VEGETATION PLAN. VEGETATION <br />SHALI. BE MONITORED AND IF VF.(;F.TATION GROWTH IS UNSUCCESSFUL, ADDI- <br />TIONAL, COVER OF THE BEST AVAILABLE. MATERIAL OR SOIL 'TREATMENTS <br />SHALL BE APPLIED. <br />PARKING 1.01' ROCK DISPOSAL AREA <br />THE C'ONF'IGURATION OF THE SURFACE AND OUTSLOPE OF THE CONSTRUCTED <br />FILL SHALL RE THE SAME AS THE RECLAIMED CONFIGURATION, EXCEPT WHERE'. <br />THE FILL IS REGRADED UPON FINAL ABANDONMENT FOR CONSTRUCTION OF A <br />PERMANENT DRAINAGE CHANNEL. <br />A 10 -FOOT (MINIMUM) HEIGHT BUTTRESS FILL SHALL BE CONSTRUCTED AT <br />THF,'TOF OF THF. HOCK CUT AT THE NORTH END OF THE FILL. THE FILL <br />BUTTRESS SHAi,I. HAVE A 2(H):I(V) OUTSLOPE. <br />THE FILL BUTTRESS SHALL BE CONSTRUCTED BY PLACING FILL IN <br />HORIZONTAL LIFTS NOT EXCEEDING 24 INCHES IN LOOSE THICKNESS AND <br />CO',1PACTI•:D UNIFORMLY BY ROUTIN(; CONSTRUCTION EQUIPMENT OVER THE FILL, <br />SURFACF. <br />COMPACTED SOIL IN THE BUTTRESS SHALL HAVE A DRY DENSITY OF AT LEAST <br />90 PERCENT OF THE MAXIMUM DRY DENSI'T'Y AS DETERMINED BY THE AASHTO <br />T99 -74 SPEC IFI CAT U)`: ( "ST'A'NDARD PROCTOR "). <br />UPON FINAL AHANDONMFNT, 4 PERMANENT DRAINAGE. CHANNEL, SIZED IN <br />ACCORDANCE WITH THE EXISTING RECLAMATION PL =.N, SHALL BE CONSTRUCTED <br />ACROSS THE F'I1A. SURFACF,, AS SHOWN 0'V THE CONSTRUCTION DRAWINGS, AT <br />A MINIMUM DISTANCE: OF 5 FEE:'! FROM THE TOE OF' THE FILL BUTTRESS. <br />THE EAST END OF THE FILL SHALL BE GRADED AT 10 PERCENT TO THE EAST <br />FOR FINAL RECLAMATION SO THAT THE PEIIM.ANENT DRAINAGE. CHANNEL DOES <br />NOT' DISCHARGE. OVF'R THE FILL OUTSLOPE. <br />THE: PERMANENT DRAINAGE: CHANNEL SHALI, RE HIPRAPPED IN ACCORDANCE, <br />WITH I'HE E:XIS'CIN•; RF.CI,AMATION PLAN WHERE ITS GRADIENT EXCEEDS 10 <br />PI:I(CF.sT. <br />SUBSEQUENT TO CONSTRUCTION OF THE FILL, THE FILL OUTSLOPE SHALL RE <br />REVEC;ETATED IN ACCORDANCE WITH THE EXISTING VEGETATION PLAN. <br />VEGETATION ON THE FILLS SHALL BE MONITORED AND IF VEGETATION GROWTH <br />IS UNSUCCESSFUL, ADDITIONAL COVER OF THE HEST AVAILABLE. MATERIAL OR <br />SOIL TREATMENTS SHALL HE APPLIED. <br />4.0 INSPECTION <br />4.1 ROCK ENTRY PORTALS AND ROAD DRAINAGE <br />4.1.1 CONSTRUCTION IN THE PORTAL. AREAS AND INSTALLATION OF THE SURFACE - <br />WATER DRAINAGE SYSTEMS SHALL BE INSPECTED AND CERTIFIED AFTER <br />CONSTRUCTION BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER. <br />4.1.2 AN EXPERIENCED GEOTECHNI(It. ENGINEER SHALL RE PRESENT DURING CON- <br />STRUCTION OF PORTAL FACEUPS TO ENSURE THAT THE FACEUPS ARE COM- <br />PLETED IN ACCORDANCE WITH THESE SPECIFICATIONS. <br />4.1.3 THE PORTAL AREAS SHALL BE INSPECTED DAILY WHILE ENTRY DEVELOPMENT <br />IS WITHIN SOILS AND UNTIL THE ENTRIES HAVE BEEN DEVELOPED TO AT <br />LEAST 150 FEET FROM THE PORTALS IN ORDER TO IDENTIFY ANY IN- <br />STABILITY THAT MAY DEVELOP IN THE SLOPES IN THE VICINITY OF THE <br />PORTAL. <br />4.2 DEVELOPMENT ROCK DISPOSAL <br />4.2.1 DEVELOPMENT ROCK DISPOSAL FILLS SHALL. BE INSPECTED BY A QUALIFIED <br />REGISTERED PROFESSIONAL. ENGINEER. <br />4.2.2 DISPOSAL INSPECTIONS SHALI. OCCUR QUARTERLY, BEGINNING WITHIN 7 DAYS <br />AFTER FOUNDATION PREPARATION. <br />4.2.3 IN ADDITION TO QUARTERLY INSPEC'T'IONS, SITFS SHALT, RE INSPECTED <br />DURING, THE 1'()LLOWING CONSTRUC'T'ION PERIODS: <br />A) COMPLET'IE)N OF FOUNDATION PREPARATION AND INSTALLATION OF PIPES <br />OR OTHER STRUCTURES THAT WOULD 13F LOCATE _D WITHIN THE FILL; <br />R) PLACEMENT AND COMPACTION OF FILL MATERIALS; AND <br />C) RECLAM:ATU)N. <br />4.2.9 211E ITISPEC2IIIG ENGINEERS' CERTIFIED REPORTS SHALL BE PROVIDED TO <br />'tllE COLORADO MINED LAI1D RECLAMATION DIVISION WITHIN 2 WEEKS AFTER <br />EACII INSPECTION. THE REPORTS EIILL CERTIFY THAT THE FILL HAS BEE14 <br />(:GNSTRUCTED AS SPECIFIED II) TINE DESIGN. A COPY OF THE REPORTS <br />SHALL BE RETAINED AT TINE MINE OFFICE. <br />Vf®4 f® <br />,UN <br />MANED �'DO ASA�N <br />PEG�MA�AON <br />I , ` <br />DAAM'h B D L ;.> -E N- /A 6ATE 3/27/87 <br />CHECKED GM EKE- Da Ho 873 -207 1 <br />D «� " 7 OF 7 <br />Golder Associates °' ' IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII <br />,104431 <br />3.4.3 <br />1.2.12 <br />THE OUTSLOPE OF THE PERMANENT BELTLINE PORTAL BENCH SHALL NOT EX- <br />2.4 <br />CONSTRUCTION <br />CEED 2(H):1(V). <br />2.4.1 <br />TUNNEL DEVELOPMENT ROCK SHALL RE SPREAD IN APPROXIMATELY HORI7.ONTA1. <br />LAYERS NOT EXCEEDING 24 INCHES IN LOOSE THICKNESS AND UNIFORMLY <br />COMPACTED BY ROUTING CONSTRUCTION EQUIPMENT OVER THE SURFACE OF T'HE' <br />1.3 <br />SURFACE DRAINAGE <br />LIFT. <br />1.3.1 <br />THE EXISTING SURFACE DRAINAGE SYSTEM SHALI, RE DISRUPTED TO TILE: <br />2.4.2 <br />SURFACE. DRAINAGE THE FILL SHALL RE MAINTAINED THROUGHOUT CON- <br />3.5 <br />MINIMUM EXTENT POSSIBLE DURING CONSTRUCTION. <br />MINIMUM <br />BY GRADING G THE SURFACE. TO A MINIMUM SLOPE OF 2 PERCENT <br />3.5.1 <br />1.3.2 <br />WHERE: THE F,XIS'CING DRAINAGE SYSTEM WOULD BF DISRUPTED, SURFACE: <br />AND ENSURING THAT NO SIGNIFICANT SURFACE DEPRESSIONS EXIST. <br />DRAINAGE MODIFICATIONS SPECIFIED ON THE CONSTRUCTION DRAWINGS SHALL <br />2.4.3 <br />NO FILL MATERIAL SHALL BE PLACED ON STANDING WATER, SNOW, OR ICE.; <br />BE COMPLETED AS QUICKLY AS POSSIBLE. 1'0 RESTORE: DRAINAGE,. <br />NOR SHALL SNOW, ICE, OR OTHER DELETERIOUS MATERIALS BE INCORPORATED <br />INTO THE FILL. <br />3.5.2 <br />1.4 <br />PORTAL DEVELOPMENTC <br />2.4.4 <br />IT IS ANTICIPATED THAT FILi, MATEHIAL.S WILL CONSIST PREDOMINANTLY OF <br />1.4.1 <br />TUNNEL FACEUPS FOR PORTAL DEVELOPMENT' SHALI. NOT COMMENCE UNTIL THE <br />FRESH SANDSTONES WITH A LIMITED AMOUNT uF SHALE. ANY MATERIALS <br />STRENGTH <br />'TUNNELING CONTRACTOR OR CREW ARF RF4DY TO COMMENCE TUNNELING. <br />ENCOUNTERED THAT MAY SLAKE OR HAVE A SIGNIFICANTLY LOWER <br />MIXED WITH MORE <br />3,5.3 <br />THAN THE EXPECTED FILL MATERIAL SHALL RE THOROUGHLY <br />1.4.2 <br />TUNNEL FACEUPS SHALL BE LIMITED TO THE SIZE: OF THE ENTRIES; NO <br />COMPETENT MATERIALS AND SHALL RE INCORPORATED INTO THE NORTHERN <br />THE VENTILATION <br />EXCESS EXCAVATION FOR THE PORTAL SHALI. HE PERMITTED WITHOUT THE <br />PORTIONS OF THE FILLS, OR SHALL BE DISPOSED OF IN <br />BE INCORPORATED INTO THE FILL <br />EXPRESS CONSENT OF COLORADO WESTMORELAND INC. OR ITS AUTHORI'Z.ED <br />SHAFTS. NO WEAK MATERIALS SHALL <br />FOUNDATION OR IN THE VICINITY OF THE FILL. OUTSLOPE. <br />3.5.4 <br />REPRESENTATIVE. <br />SOILS OVERLYING THE ENTRIES .SHALL BE FULLY SUPPORTED <br />2.4.5 <br />THE CONSTRUCTED HEIGHT OF THE PORTAL AREA FILL SHALL EXCEED THE <br />1.4.3 <br />COLI•L'VIAL <br />'!.L TUNNELING TO FNSURF'THAT NO DEFORMATIONS <br />DESIGN HEIGHT BY .APPROXIMATELY 5 PERCENT TO INSURE THA'C FUTURE <br />THROUGHOUT SOFT GROU%r, <br />INSTABILITY ARI' PFR:,ITTF.D TO DEVELOP. <br />SETTLEMENT OF 'THE, FILL. WILT, NOT DISRUPT THI NORTHERLY DIRECTION OF <br />3,5.5 <br />THAT COULD RESULT IN SL.OPI. <br />THE SURFACE DRAIN-AGE OF THE TOP OF THE FILL. <br />1.4.4 <br />ALL TUNNELING IN THF VICINITY OF CHE PURTAI. SHALI. Rf' ! NDFRTAKEN' IN <br />SUCK A MANNER 1'111'1' viiFRE, AI,E N(, EC('� :SST'.)' A'II3R,A'CI))N.i THAT CO1'1 D <br />RFSI.I,T IN SLOPE: ;NS: Ai31LI'TY. <br />2.5 <br />INSPLCTIONS <br />3.5.5 <br />2.5.1 <br />FILLS SHALL RF. INSPECTED DURING CONSTRUCTION IN ACCORDANCE WITH <br />SECTION 4.0 OF THIaf! SPECIFICATIONS. <br />3.5.7 <br />3.5.8 <br />3.0 RECLAMATION <br />GENERAL <br />RECLAMATION OF THE ROCK SLOPE. ENTRY PORTALS AND DEVELOPMENT ROCK <br />DISPOSAL AREAS SHALL BE PERFORMED IN ACCORDANCE WITH THE <br />CONSTRUCTION DRAWINGS AND ALL NOTES CONTAINED THEREON. <br />RECLAMATION SHALL 13E CONSISTENT WITH THE EXISTING RECLAMATION PLAN. <br />ALI, .AREAS WHICH ARE NOT MODIFIED BY THE ROCK SLOPE ENTRY PORTALS <br />AND DEVELOPMENT ROCK DISPOSAL AREAS SHALL BE RECLAIMED IN ACCORD - <br />ANCE WITH THE EXISTING RECLAMATION PLAN. <br />VENTILATION SHAFTS <br />VENTILATION SHAFTS SHALL BE BACKFA LLF.D TO THE EXISTING FAN LEVEL <br />ELEVATION WITH DEVELOPMENT HOCK. <br />ADDITIONAL ROCK OR SOIL SHALL RE USED TO MAINTAIN THE LEVEL OF THE <br />SHAFT FILL AT THE FAN LEVEL ELEVATION IF THIS IS NECESSARY DUE TO <br />SETTLEMENT OF' FILL. <br />INTERIM RECLAMATION ()F THE VENTILATION SHAFTS SHALL BE IN ACCORD- <br />ANCE WITH THE' FXISCIN(i I?F.CI.AMA'CIUN PLAN. <br />TIIF; FAN I,E.A'E'I, SHALL RF RECLAIMED UPON FINAL ABANDONMENT IN ACCORD- <br />ANCE WITH rill­ EXISTING HE:CI.AMA'I'IOS PLAN. <br />ROCK SIOPI• -ENTRY PORTALS <br />:11.1. PIPES. I'T'll ITY LINES, ETC. SI ;ALL BF REMOVED WHF:RF RE14UIRE:1) <br />BFFUHF BA( " :.FILI.IN( ;. <br />ROCK S1.0Pi INTRY PORTALS SHALI, BF HAFKFILLF.D WITH NON- COMBUSTIBLF <br />MA'rE,HIA1, FOH A MINIMUM DISTANCE OF 25 FI• :FT FHOM THE PORTAL OPENINGS <br />PE!1 :3O CFR. 75.1711 -2. <br />THE. ROCK SLOPE ENTRY PORTALS SHALL RE BACKF 11.I.F.D IN .ACCORDANCE: WITH <br />THF: RECLAIMED SLOPE. CONF'IGURA'TIONS IN "I'HI• FXISCING RECLAMATION <br />PLAN. <br />L'PON FINAL A..ANDONNFST, THE PORTAL AREAS SHALL BE RECLAIMED IN <br />A(01RDAVCE WITH THE EXISTING RECl,AMATION P!.:AN. <br />PORTAL LEVEL ROCK DISPOSAL AREA <br />THE CONFIGURATION OF CONSTRUCTED DISPOSAL FILL SHALL, BF. THE.- SAME AS <br />THE RECLAIMED CONF'IGURAT'ION, EXCEPT AS NOTED IN 3.4.2. <br />PRIOR TO FINAL RECLAMATION, THE TOP OF THE FILL SHALL BE REGRADED <br />IF NECESSARY TO ENSURE THE PERMANENT OVERLAND FLOW OF RUNOFF TOWARD <br />THE PERMANENT DRAINAGE. CHANNEL NORTH OF THE FILL. <br />SUBSEQUENT TO CONSTRUCTION OF THE FILL, FILL OUTSLOPES SHALL BE <br />REVEGETATED IN ACCORDANCE WITH THE VEGETATION PLAN. VEGETATION <br />SHALI. BE MONITORED AND IF VF.(;F.TATION GROWTH IS UNSUCCESSFUL, ADDI- <br />TIONAL, COVER OF THE BEST AVAILABLE. MATERIAL OR SOIL 'TREATMENTS <br />SHALL BE APPLIED. <br />PARKING 1.01' ROCK DISPOSAL AREA <br />THE C'ONF'IGURATION OF THE SURFACE AND OUTSLOPE OF THE CONSTRUCTED <br />FILL SHALL RE THE SAME AS THE RECLAIMED CONFIGURATION, EXCEPT WHERE'. <br />THE FILL IS REGRADED UPON FINAL ABANDONMENT FOR CONSTRUCTION OF A <br />PERMANENT DRAINAGE CHANNEL. <br />A 10 -FOOT (MINIMUM) HEIGHT BUTTRESS FILL SHALL BE CONSTRUCTED AT <br />THF,'TOF OF THF. HOCK CUT AT THE NORTH END OF THE FILL. THE FILL <br />BUTTRESS SHAi,I. HAVE A 2(H):I(V) OUTSLOPE. <br />THE FILL BUTTRESS SHALL BE CONSTRUCTED BY PLACING FILL IN <br />HORIZONTAL LIFTS NOT EXCEEDING 24 INCHES IN LOOSE THICKNESS AND <br />CO',1PACTI•:D UNIFORMLY BY ROUTIN(; CONSTRUCTION EQUIPMENT OVER THE FILL, <br />SURFACF. <br />COMPACTED SOIL IN THE BUTTRESS SHALL HAVE A DRY DENSITY OF AT LEAST <br />90 PERCENT OF THE MAXIMUM DRY DENSI'T'Y AS DETERMINED BY THE AASHTO <br />T99 -74 SPEC IFI CAT U)`: ( "ST'A'NDARD PROCTOR "). <br />UPON FINAL AHANDONMFNT, 4 PERMANENT DRAINAGE. CHANNEL, SIZED IN <br />ACCORDANCE WITH THE EXISTING RECLAMATION PL =.N, SHALL BE CONSTRUCTED <br />ACROSS THE F'I1A. SURFACF,, AS SHOWN 0'V THE CONSTRUCTION DRAWINGS, AT <br />A MINIMUM DISTANCE: OF 5 FEE:'! FROM THE TOE OF' THE FILL BUTTRESS. <br />THE EAST END OF THE FILL SHALL BE GRADED AT 10 PERCENT TO THE EAST <br />FOR FINAL RECLAMATION SO THAT THE PEIIM.ANENT DRAINAGE. CHANNEL DOES <br />NOT' DISCHARGE. OVF'R THE FILL OUTSLOPE. <br />THE: PERMANENT DRAINAGE: CHANNEL SHALI, RE HIPRAPPED IN ACCORDANCE, <br />WITH I'HE E:XIS'CIN•; RF.CI,AMATION PLAN WHERE ITS GRADIENT EXCEEDS 10 <br />PI:I(CF.sT. <br />SUBSEQUENT TO CONSTRUCTION OF THE FILL, THE FILL OUTSLOPE SHALL RE <br />REVEC;ETATED IN ACCORDANCE WITH THE EXISTING VEGETATION PLAN. <br />VEGETATION ON THE FILLS SHALL BE MONITORED AND IF VEGETATION GROWTH <br />IS UNSUCCESSFUL, ADDITIONAL COVER OF THE HEST AVAILABLE. MATERIAL OR <br />SOIL TREATMENTS SHALL HE APPLIED. <br />4.0 INSPECTION <br />4.1 ROCK ENTRY PORTALS AND ROAD DRAINAGE <br />4.1.1 CONSTRUCTION IN THE PORTAL. AREAS AND INSTALLATION OF THE SURFACE - <br />WATER DRAINAGE SYSTEMS SHALL BE INSPECTED AND CERTIFIED AFTER <br />CONSTRUCTION BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER. <br />4.1.2 AN EXPERIENCED GEOTECHNI(It. ENGINEER SHALL RE PRESENT DURING CON- <br />STRUCTION OF PORTAL FACEUPS TO ENSURE THAT THE FACEUPS ARE COM- <br />PLETED IN ACCORDANCE WITH THESE SPECIFICATIONS. <br />4.1.3 THE PORTAL AREAS SHALL BE INSPECTED DAILY WHILE ENTRY DEVELOPMENT <br />IS WITHIN SOILS AND UNTIL THE ENTRIES HAVE BEEN DEVELOPED TO AT <br />LEAST 150 FEET FROM THE PORTALS IN ORDER TO IDENTIFY ANY IN- <br />STABILITY THAT MAY DEVELOP IN THE SLOPES IN THE VICINITY OF THE <br />PORTAL. <br />4.2 DEVELOPMENT ROCK DISPOSAL <br />4.2.1 DEVELOPMENT ROCK DISPOSAL FILLS SHALL. BE INSPECTED BY A QUALIFIED <br />REGISTERED PROFESSIONAL. ENGINEER. <br />4.2.2 DISPOSAL INSPECTIONS SHALI. OCCUR QUARTERLY, BEGINNING WITHIN 7 DAYS <br />AFTER FOUNDATION PREPARATION. <br />4.2.3 IN ADDITION TO QUARTERLY INSPEC'T'IONS, SITFS SHALT, RE INSPECTED <br />DURING, THE 1'()LLOWING CONSTRUC'T'ION PERIODS: <br />A) COMPLET'IE)N OF FOUNDATION PREPARATION AND INSTALLATION OF PIPES <br />OR OTHER STRUCTURES THAT WOULD 13F LOCATE _D WITHIN THE FILL; <br />R) PLACEMENT AND COMPACTION OF FILL MATERIALS; AND <br />C) RECLAM:ATU)N. <br />4.2.9 211E ITISPEC2IIIG ENGINEERS' CERTIFIED REPORTS SHALL BE PROVIDED TO <br />'tllE COLORADO MINED LAI1D RECLAMATION DIVISION WITHIN 2 WEEKS AFTER <br />EACII INSPECTION. THE REPORTS EIILL CERTIFY THAT THE FILL HAS BEE14 <br />(:GNSTRUCTED AS SPECIFIED II) TINE DESIGN. A COPY OF THE REPORTS <br />SHALL BE RETAINED AT TINE MINE OFFICE. <br />Vf®4 f® <br />,UN <br />MANED �'DO ASA�N <br />PEG�MA�AON <br />I , ` <br />DAAM'h B D L ;.> -E N- /A 6ATE 3/27/87 <br />CHECKED GM EKE- Da Ho 873 -207 1 <br />D «� " 7 OF 7 <br />Golder Associates °' ' IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII <br />,104431 <br />