Laserfiche WebLink
• 2.05.3(7) Coal Handling Structures <br />A preparation plant, unit train loadoui facility, and an overland belt conveyor are <br />located within the permit area. Exhibits 6A, 7A, 8A, 10A and 11A show the <br />locations of coal handling and storage facilities. Table 12-1, Tab Section 12, lists <br />all coal handling and storage facilities within the permit area. Surface <br />disturbance created by these facilities is minimized. Refer to Tab Section 14 for <br />details on removal of structures no reclamation of the disturbed area. <br />2.05.3(8) Coal Mine Waste and Non-Coal Processing Waste <br />Before January, 1981, coal processing waste was disposed of at Roadside <br />Refuse Disposal Area RSRDA, located at the Roadside South Portals. This area <br />is no longer used for coal processing waste disposal. Stability analysis of the <br />RSRDA is given in Appendix 13-4. Final regrading of this pile is discussed in <br />Tab Section 14. <br />• Coal processing waste is currently being disposed of at two sites located <br />im <br />n <br />lf mile <br />t <br />l <br />h <br />t <br />f th <br />th P <br />rt <br />l <br />C <br />Ref <br />R <br />d <br />id <br />N <br /> approx <br />e <br />y o <br />a <br />wes <br />s <br />or <br />s, <br />ameo <br />use <br />a <br />e- <br />o <br />e <br />oa <br />e <br />o <br />a <br /> Disposal Area Nos. 1 and 2 (CRDA-1 &CRDA-2). A third site, CRDA-3, has <br /> been permitted but will not be developed because the Operator does not plan to <br /> construct CRDA-3 since the mine is idle and is not expected to operate in the <br /> foreseeable future.. Details for construction and sediment control at CRDA-1 are <br /> given on Exhibits 9A, 9B, 18 and 20. Details of the CRDA-2 & 3 construction <br /> and sediment control were approved in 1985 as permit revision PRO1 and are <br /> shown on Exhibits 51, 52 and 53. The coal processing waste originates at the <br /> Roadside South coal preparation facility and from the Roadside North screening <br /> and crushing facility. The waste material is hauled by truck to the refuse <br /> disposal areas where it is spread in maximum lifts of 24 inches and compacted. <br /> Once the piles are constructed to the contours shown in Exhibits 9C, 51 and 52, <br /> reclamation will take place as described in Tab Section 14. Drainage design is <br /> given in Appendix 13-2. Soil information is given in Appendices 9-4 and 9-5, Tab <br /> Section 9. Cultural Resource information is given in Appendices 5-4 thru 5-7, <br />• Tab Section 5. <br /> 13-20 (Rev. 1 /00) <br />