Laserfiche WebLink
<br />• <br />CAMEO BORROW AREA 1 (CBA 1) <br />CBA 1 was used as a borrow area in 1994 and to a small extent in 2002. <br />Runoff is diverted to anon-discharging sump using berms around the low edge <br />of the disturbance. The berms will be maintained to a height of 2'. The sediment <br />level will be kept below the maximum design level and water will not be allowed <br />to stay in the pond above the maximum sediment level. After settling, excess <br />water will be transferred to Coal Canyon drainage for discharge as part of the <br />Stormwater Management Plan. See Exhibit 96, Table 13-5 and Appendix 13-3 <br />for drainage design details. <br />CAMEO BORROW AREA 2 (CBA 2) <br />CBA 2 was used in 1994 and was used extensively in 2002. Alluvial material <br />was removed northwest of Coal Gulch. During 2002 material excavation began <br />at the south bank of Pond 11 and proceeded to the southwest which expahded <br />the size of Pond 11. See Exhibits 9B and 52. Previously pond 11, was <br />redesigned. Current design (See Appendix 13-2) includes runoff from CBA 2. <br />The initial installation of Pond 11 will contain design runoff and sediment <br />volumes from CBA 2 with an emergency spillway designed for the combination of <br />CBA 2 and CRDA 3. <br />Runoff from Cameo Borrow Area 2 (CBA 2) will be directed to Pond 11. Pond 11 <br />has adequate capacity for CBA 2. See Exhibit 52, Table 13-4 and Appendix 13- <br />2 for details. <br />The East collection ditch at CBA 2 was obliterated during the 2002 use of CBA- <br />2. This collection ditch is no longer required since all drainage from the borrow <br />area flows to Pond 11. <br />• 13-15 (Rev. 12/02 ) <br />