My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120501
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:12 PM
Creation date
11/25/2007 8:31:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007013
IBM Index Class Name
Permit File
Doc Date
4/6/2007
Doc Name
Encroachment Number
From
Kinder Morgan
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KINDERORGAN <br />Guidelines for Design and Construction near <br />Kinder Morgan Operated Facilities <br />Name of Company: Kinder Morgan Interstate Gas Transmission <br />The list of design, construction and contractor requirements, including but not limited to the following, for the design and <br />installation of foreign utilities or improvements on KM right-of-way (ROW) are not intended nor do they waive or modify any <br />rights KM may have under existing easements or ROW agreements. Reference existing easements and amendments for <br />additional requirements. This list of requirements is applicable for KM facilities on easements only. Encroachments on fee <br />properly should be referred to the ROW Department. <br />Design <br />• KM shall be provided sufficient prior notice of planned activities involving excavation, blasting, or any type of construction <br />on KM's ROW to determine and resolve any location, grade or encroachment problems-and provide protection of our <br />facilities and the public before the actual work is to take place. <br />• Encroaching entity shall provide KM with a set of drawings for review and a set of final construction drawings showing all <br />aspects of the proposed facilities in the vicinity of KM's ROW. The encroaching entity shall also provide a set of as-built <br />drawings showing the proposed facilities in the vicinity of KM's ROW. <br />• Only facilities shown on drawings reviewed by Kinder Morgan Interstate Gas Transmisslon (Company) will be approved <br />for installation on KM's ROW. All drawing revisions that effect facilities proposed to be placed on KM's ROW must be <br />approved by KM in writing. <br />• KM shall approve the design of all permanent road crossings. <br />• Encroaching entity shall, at the discretion of the Kinder Morgan, Inc., incorporate Heath ATI "sniffer" Gas Detection Units in <br />the design of paved areas or "Green Belt" areas of KM ROW. The units shall be installed per KM Standard TYP•V•0100- <br />6010. <br />• Any repair to surface facilities following future pipeline maintenance or repair work by KM will be at the expense of the <br />developer or landowner. <br />• The depth of cover over the KM pipelines shall not be reduced nor drainage altered without KM's written approval. <br />• Construction of any permanent structure, building(s) or obstructions within KM pipeline easement is not permitted. <br />• Planting of shrubs and trees is not permitted on KM pipeline easement. <br />• Irrigation equipment i.e. backflow prevent devices, meters, valves, valve boxes, etc. shall not be located on KM easement. <br />• Foreign line, gas, water, electdc and sewer lines, etc., may cross perpendicular to KM's pipeline within the ROW, provided <br />that a minimum of two (2) feet of vertical clearance is maintained between KM pipeline(s) and the foreign pipeline. <br />Constant line elevations must be maintained across KM's entire ROW width, gravity drain lines are the only exception. <br />Foreign line crossings below'the KM pipeline must be evaluated by KM to ensure that a significant length of the KM line is <br />not exposed and unsupported during construction. When installing underground utilities, the last line should be placed <br />beneath all existing lines unless it is impractical or unreasonable to do so. Foreign line crossings above the KM pipeline <br />with less than 2 feet of clearance must be evaluated by KM to ensure that additional support is not necessary to prevent <br />settling on top of the KM natural gas pipeline. <br />• A foreign pipeline shall cross KM facilities at as near aninety-degree angle as possible. A foreign pipeline shall not run <br />parallel to KM pipeline within KM easement without written permission of KM. <br />• The foreign utility should be advised that KM maintains cathodic protection on their pipelines. The foreign utility must <br />coordinate their cathodic protection system with KM's. At the request of KM, foreign utilities shall install (or allow to be <br />installed) cathodic protection test leads at all crossings for the purposes of monitoring cathodic protection. The KM <br />Cathodic Protection (CP) technician and the foreign utility CP technician shall perform post construction CP interference <br />testing. Interference issues shall be resolved by mutual agreement between foreign utility and KM. All costs associated <br />with the correction of cathodic protection problems on KM pipeline as a result of the foreign utility crossing shall be borne <br />by the foreign utility for a pedod of one year from date the foreign utility is put in service. <br />Reference: O&M Procedure 204 Page 1 of 3 OM200-29 <br />Distribution: 05/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.