Laserfiche WebLink
R-14 <br />(iii) The proposed sequence of reclamation stages is consistent <br />throughout Phases A, B, C, D, and E. <br />1. Replacement of overburden -rough grading <br />2. Replacement of topsoil (where applicable) <br />3. Final grading <br />4. Seeding <br />(f) <br />(i) Final grading of the mining area will be completed such that <br />no reclaimed slope will exceed 3:1. Contours shown o ~ <br />revised Exhibit F are representative of the final grading plan <br />proposed. It is anticipated that pre-mining slopes in excess <br />of 3:1 wherein no mining occurs will remain at their natural <br />gradient. <br />(ii) Seeding (see above} <br />{iii) Fertilization will likely be required within Phase E. The <br />following recommendations were received from area experts <br />based on soil type and proposed seed mixture: <br />Type: <br />Mixture: <br />Quantities: <br />Time of application: <br />(iv) Revegetation (see above) <br />(v) Topsoiling within phases A, B, C, and D will be replaced at <br />depths ranging from 6 - 8" or as dictated by the amourr: <br />present during pre-mining removal. It is not expected that <br />adequate topsoil for replacement exists in Phase E (see: <br />section (a) above). <br />