Laserfiche WebLink
TABLE OF CONTENTS <br />VOLUME VII - GEOTECHNICAL STUDIES <br />Introduction <br />2. Preliminary Geotechnical Engineering Study -July 10, 1996 <br />Additional Geotechnical Study -Evaluation of Reclaimed Slopes -October 10, 1996 <br />4. P~dditional Stability Analyses -Road Cuts and Topsoil Pile -January 7, 1996 <br />5. Geotechnical Laboratory Testing -Proposed Gob Pile -January 7, 1997 <br />6. Maps VII-1 & 2 Section & Bore Hole Locations <br />Iixpansive Soil Evaluation -Reclaimed Fill Slopes -January 3l, 1997 <br />8. Additional Geotechnical Investigation -Coal Mine Waste Bank -February 12, 1997 <br />Geotechnical Engineering Study, Sediment Pond B, Lambert and Associates-January 26, <br />2000. <br />Geotechnical Engineer Report -Slope Stability Analysis - PR-03 - Terracon - 6/2/99 <br />10. Geotechnical Engineering Study, Coal Preparation Facility, August 11, 2003 <br />Geotechnical Engineering Study, B-Seam Portal Bench, July 30, 2003 <br />Slope Stability Analyses, B-Seam Portal & Stockpile, April 7, 2003 <br />11. "Cemporary Rock Catchment Design dated February 12, 2004 by Yeh and Associates, Inc. <br />Collin L. Stewart Letter report dated March 9, 2004 <br />'Yeh and Associates, Inc. letter report dated March l 1, 2004 <br />MR-034 vii 03104 <br />R PPRoVE,4 <br />.3 J ~-4 ~o it <br />