Peabody Holding Company: Notice of Violation List Page: 1 <br /> <br />Date: 01 /10/200 <br />For NOV'S Issued Between 03/18/1997 and 09/17/1999 <br />97-008 Company: Seneca Coal Company <br />Mine: YOAST MINE <br />Permit: C-94-082 MSHA ID: OS-00304 <br />County: ROUTT State: Colorado <br />NOV: C-97-003 Issued: 03/78/1997 <br />Issuer: Colorado Division of Minerals and Geology <br />Cause: FAILURE TO PASS DISTURBED AREA RUNOFF THROUGH A SEDIMENT POND BEFORE <br /> LEAVING THE PERMIT AREA; <br />Status: TERMINATED. t) 03/19/97; 2) 07121/97; <br />As of: 07/21/1997 <br />Action: 1) REPAIRED DITCH TO STOP FLOW THROUGH BREACHES AND ROUTE RUNOFF TO <br /> POND 010; 2) MAINTAINED DITCH TO ENSURE 171S IN ACCORDANCE WITH THE <br /> APPROVED DESIGN SPECIFICATIONS; <br />Penalty: CONFERENCE HEARING HELD 05/20/97, ASSESSED $1350.00 ON 05/27/97: PAID ON <br /> 614/97; <br />97.011 Company: Seneca Coal Company <br />Mine: YOAST MINE <br />Permit: C-94-082 MSHA ID: OS-00304 <br />County: ROUTT State: Colorado <br />NOV: C-97-004 Issued: 03118!1997 <br />Issuer: Colorado Division of Minerals and Geology <br />• <br />Cause: 1) FAILURE TO PREVENT ADDITIONAL SUSPENDED SOLIDS AND MINIMIZE SILTATION TO <br /> STREAM FLOW OUTSIDE THE PERMIT AREA; 2) FAILURE TO CONSTRUCT HAULROAD <br /> RELIEF DRAINS AND IMPLEMENT EROSION CONTROL IN LIEU OF RELIEF DRAINS; <br />Status: TERMINATED: 1) 07177/97; 2a) 03/27197 2b) 06/17197; 3)07177197; <br />As of: 07/1711997 <br />Action: 1) REMOVED ALL MATERIAL FROM CHANNEL OF ANNAND DRAW, 2) IMPLEMENTED <br /> TEMPORY SEDIMENT CONTROL; REMOVED FILL MATERIAL FROM CHANNEL NEAR <br /> ROUTT COUNTY RD 27; 3) CONSTRUCTED ROAD DRAINS ON ROAD A; <br />Penally: ASSESSED $1850.00 ON 04111/97; CONFERENCE HEARING HELD ON 05/20/97; PAID ON <br /> 6/4/97; <br />97_047 Company: Seneca Caal Company <br />Mine: SENECA 11-W <br />Permit: C-82-057 MSHA ID: 65-00304 <br />Count: ROUTT State: Colorado <br />NOV: CV-97-015 Issued: 09/26/1997 <br />Issuer: Colorado Division of Minerals and Geology <br />Cause: FAILURE TO MAINTAIN PRIMARY SPILLWAY CAUSING DISCHARGE FROM EMERGENCY <br /> SPILLWAY; <br />Status: TERMINATED: 9/26/97; <br />As oT: 01!02/1998 <br />Action: UNPLUGED PRIMARY SPILLWAY ON POND 006 TO ALLOW FOR DRAINAGE AS PER THE <br /> PERMIT DESIGN; <br />Penalty: CONFERENCE HELD 12/01!97; ASSESSED $1250.00 ON 12/09197, PAID ON 1102/98; <br />/ 1 <br />u <br />