My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120301
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:05 PM
Creation date
11/25/2007 8:20:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200510912
IBM Index Class Name
Permit File
Doc Date
10/28/2005
Doc Name
NOI Application
From
Colowyo Coal Company
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
accommodate drilling and support equipment. Attempts will be made to adjust <br />locations to minimize the disturbance at each site. For instance, sites along steeper <br />slopes will be longer and narrower, taking advantage of space created along the <br />access road. Also, where possible, the access road and/or site(s) will be moved or <br />adjusted to avoid large well-established stands of mountain shrubs or aspen. <br />In general, all drill site locations will be cleared and grubbed. Topsoil will be <br />removed and stockpiled before the site is leveled. Shallow foam or mud pits will be <br />dug to detain drilling fluids and possibly precipitation runoff from the drill site. <br />In addition, during the course of the 2005 Exploration Program, no vehicles will be <br />allowed to go cross country under muddy conditions. In muddy conditions, a road <br />must be cleared in accordance with prudent topsoil salvage practices. <br />All proposed drill locations are shown on the enclosed map <br />3. Preventative Measures <br />Fire The use of open fires will be prohibited. Welding operations will only be <br />permitted when adequate fire protection is on hand. Weed burners and similar <br />equipment used to warm pazts on the drill rig or other support equipment during <br />periods of extreme cold temperatures may be needed, and will only be permitted <br />when adequate fire protection is on hand. Portable fire extinguishers will be <br />provided on various pieces of equipment, and the water trucks supporting the <br />drilling operation will also serve as backup fire protection. <br />Soil Erosion As mentioned above, measures will be taken to protect the topsoil <br />resource. In addition to salvaging and stockpiling the topsoil resource during road <br />and drill location construction, once the road or drill location is no longer needed <br />for its intended purpose, the topsoil will be respread with the regrading operation. <br />Once the topsoil is regraded, it will be scarified and seeded. With the inclusion of <br />runoff controls mentioned above, no other impacts causing erosion to the topsoil <br />resource are anticipated. <br />For drill site locations that do not drain to a sediment pond, sediment control <br />measures utilized by Colowyo will be a combination of one or several of the <br />following: berms, mud pits, rough soil conditions of the pad site, brush left in the <br />soil materials, diversion ditches, and/or contour furrows. <br />Surface and Groundwater Pollution Construction of access roads, drill locations, <br />and any other disturbance associated with the exploration will be conducted in <br />accordance with all applicable Federal, State, and Local governmental rules and <br />regulations pertaining to protection of the hydrologic balance. Site specific <br />conditions at each drill location or access road to a drill location will dictate what <br />controls will be incorporated into the construction plan to control sediment and <br />N9000_ENGVUAN\DMG\NOI DOC\06NOI\06 N01 Text.doc <br />1027/05 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.