Laserfiche WebLink
Su_ biect P e s Volume <br />• 3.3.2 Management of Devebpment Drill Holes 3-24 III <br />3.3.2.1 Drill Sites in Areas Where Topsoil 3-24 -3-27 tll <br /> Has Not Been Salvaged <br />3.3.2.2 Drill Sites in Areas Where Topsoil 3-27 Iii <br /> Has Been Salvaged <br />3.3.2.3 Areas Not to be Drilled WRhin the 3-27 III <br /> Permit Boundary <br />3.3.2.4 Suitable Materials for Abandoned Drill Holes 3-27 III <br />3.4 Blasting 3.28 III <br />3.4.1 Pre-Blast Survey 3-28 III <br />3.4.2 Public Notice 3-29 111 <br />3.4.3 Blasting Operations 3-30 -3-32 III <br />3.4.4 Records 3-32 -3-38 ttt <br />3.5 Backfilling and Grading 3-37 III <br />3.5.1 Methods and Equipment 3-37 -3-38 III <br />3.5.2 Timing 338 - 3~t0 III <br />3.5.3 Post Mining Contours 3-40 - 3-43a III <br />3.5.4 Regrading Boxcut Spoils 3-44 -3-45 III <br />3.5.5 Final Highwalls 3.45 - 3~8 111 <br />3.5.8 Covering Coal and Acid or Toxic Forming 3-48 -3-48 III <br /> Material <br />3.5.7 Non-Applicable Situations 3-48 -3-50 III <br />3.8 Revegetation Plan 3-51 III <br />• <br />3.6.1 Major Revegetation Issues for Trapper Mme 3-51 III <br />3.8.1.1 Soil Depth and Quality 3-51 -3-55 III <br />3.8.1.2 Erosion 3-55 -3-58 III <br />3.6.1.3 Plant Species Diversity 3-59 -3-68 111 <br />• &97 <br />n4AV ~ ~ 1998 <br />i-7 <br />