My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120278
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:04 PM
Creation date
11/25/2007 8:18:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Permit File
Doc Date
5/23/2002
Doc Name
Letter of Objection
From
DMG
To
Mary K Hovis Darlene Macey
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t,.s,_ <br />STATE OF COLORADO <br />DIVISION OF MINERA]_S AND GEOLOGY <br />Department of Na[urai Resources <br />1313 Sherman SC, Room 215 <br />Denver; Colorado 80203 DIVISION o F <br />Phone: (303) 866-3567 M I N E RA L S <br />FAX: (303) 832-8106 & <br /> GEOLOGY <br />May 23 <br />2002 ~ RECLAMATION <br />, MI NING•SAFETY <br />Debrah J. Veeder slu oven: <br />1531 Lexington Road cOVef"°' <br />Pueblo, CO 81001 Eire toeve o. eetor <br />Michael B. Long <br />RE: GCC Rio Grande, Inc.; Red Rock Plant and Mine Reclamation Permit Division Director <br />Application; DMG File # M-2002-004; Letter of Objection <br />Dear Ms. Veeder: <br />The Division of Minerals and Geology received your letter of concern about GCC Rio <br />Grande, Inc.'s application fora 112 reclamation permit on May 3, 2002. Unfortunately, <br />the close of the public comment was May 2, 2002, and as such, your comments were <br />received too late for official consideration or to obtain party status in this matter. <br />However, there have been a number of other timely comments received that embodied <br />the very concerns that were identified in your letter. Furthermore, it presently appeazs <br />that the formal public hearing to consider this item will be held in Pueblo. During the <br />formal public hearing members of the public are typically allowed a short comment <br />period to register their concerns directly to the board. The date, time, and location for <br />this meeting have not been established at this time, but we will keep you on the mailing <br />list for notification once the date is set. <br />Thank you for taking the time to become involved in the process. If you have any <br />questions or if I can be of further assistance, please contact Al Amundson or me at (303) <br />866-3567. <br />5~ <br />Anthony J. Waldron <br />Environmental Protection Specialist <br />Ec: Al Amundson-DMG <br />Jim Stevens-DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.