Laserfiche WebLink
• <br />-3- <br /> <br />5) This permit may be revoked or suspended for non-compliance with the Act or applicable <br />rules or regulations promulgated by the Board, the permit, or by violation of a Board Ordet. <br />6) a) Pursuant to 34-32.5-118(5) of the Ac[, the Board has a right of entry to reclaim the <br />lands affected by the operation, or to respond to an emergency as defined by C.R.S. 34-32.5-121(2) <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />determined: <br />I. that reclamation required by law to have been performed upon such lands <br />has not been performed, and <br />ii. that fmancial warranty forfeiture proceedings described in the Act or similar <br />provisions of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond [o an emergency only <br />where the Division determines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/ XX / a) Rider is attached. <br />/_/ b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LO <br />Division Director <br />M:\OSSBDC\TEM P\M AT9058.GSC <br />