My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120172
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:00 PM
Creation date
11/25/2007 8:16:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005069
IBM Index Class Name
Permit File
Doc Date
3/5/2006
Doc Name
New 112c application Bond calc
From
DMG
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-ro: Fr(e, ~-?ter-~cR <br />CIRCES Cost Estimating Software <br />~\VY~ I~IIr IVI111V IY / <br />Date : 75-Mar-2006 `~ Permit or job no. <br />User : SSS Abbreviation <br />>w1 ; Filename <br />Agency or organization name :DMG v~ <br />Permit or iob action ew 112c aoolication <br />M-2005-069 t~ Site :West Fork Pit v~ <br />none State :Colorado <br />M069-000 County :Garfield <br />I ASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />Ola -Rip pit floor ripper 1 42.9 $5,888 <br />02a -Replace 9" of topsoil over affected area dozer 1 64.7 $8,510 <br />03a -Revegetate affected area of site revege 2 32.0 $15,829 <br />04a -Transport reclamation equipment to/from site mobilize 3 7.71 $2,688 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suaroTaLS: 147.41 $32,915 <br />'includes inflation factor adjustment of : NA % TOTAL DIRECT COST • _ $32,915 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Llabillty InSllfanCe : 2.02 % Of dlleCt total = $665 <br />Performance bond : 1.05 % of direct total = $346 <br />Job Superintendent : NA` NA NA total = NA <br />Profit : 10.00 % of direct total = $3,292 <br />' not required (or eqp. operator serves as super.) TOTAL O & P = $4,31)2 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $37,217 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,861 <br />CONTINGENCY- NA` NA total= NA <br />'contingencies accounted /or at task level TOTAL INDIRECT COST= $6,163 <br />TOTAL BOND AMOUNT (direct+ indirect) = 539,078 <br />
The URL can be used to link to this page
Your browser does not support the video tag.