Laserfiche WebLink
<br /> <br />Activity Quantity Units Unit Cost Cost <br />A. Stripped Topsoil -approximately ]4 acres of disturbance <br />1. Replace 18" topsoil 33,882 C.Y. $1.35 $45,741 <br />2 Seed and mulch 14 Acres $820 $I 1,480 <br /> ~ <br />B. Place topsoil and overburden on 6 acres <br />' qq'',eu<:~< ~J ~ <br />/ <br />1. Place 2 <br />overburden 19,360 ~Y. $1.35 $26,136 <br />2. Place 6" topsoil 4840 C.Y. $].35 $6,534 <br />3. Seed and Mulch 6 Acres $820 $4920 <br />C. Dewatering trench <br />1. Push soil into trench 16,500 C.Y. $1.35 $22,275 <br />2. Replace 18" topsoil 1473 C.Y. $1.35 $1989 <br />3. Seed and mulch 1 Acres $820 $820 <br />D. Processing Site <br />1. Replace 18" topsoil 12,102 C.Y. $1.35 $16,338 <br />2.Rip and mix surface 10,000 C.Y. $0.60 $6,000 <br />2. Seed and Mulch 5 Acres $820 $4,100 <br />E. Lake shores <br />1. Backfill shoreline 11,210 C.Y. $1.35 $15,134 <br />2. Replace 18" topsoil 7,260 C.Y. $1.35 $9,801 <br />3. Seed and mulch 3 Acres $820 $2,460 <br />Reclamation cost Total $172,908 <br />Contractor Mobilization 6.0% $10,375 <br />Overhead 12.5% $21,614 <br />Administration 5.0% $8,646 <br />Total $2]3,543 <br />Disturbed acres 26.8 <br />Financial waztanty per acre $7,969 <br />