Laserfiche WebLink
• 4.8.1.2 Surface Drainage During Mining <br />The following sedion discusses diversions and culverts which will be used to control runoff during the <br />current permit tens. Since submittal of our original permit document er 1980, Trapper has submitted <br />Technical Revision (TR-25) which altered design criteria for all future diversions and culverts. It has been <br />agreed-to by the CMLRD that Trapper will not be required to after strudun~ which were constructed prior <br />to the partial approval of TR-25 (Johnson and Pyeatt sediment con1ro1) September 5, 1988. <br />Haul Road Culvert Sizino <br />Haul road culvert sizes were determined using the 10-year, 24hour precipdation event predicting ma~d- <br />mumflow rates. These mabmum flow rates and sizes were predicted through hydrobgic modeling tech- <br />niques. The results are presented in Table 4.8-1. Some haul road culverts are placed in undisturbed <br />drainages. Based on the Soil Conservation Service Curve Number Method for quantifying excess rainfall <br />or runoff volumes, the formula shows undisturbed drainages yield no neatf from the approved 10-year, <br />24hour prectpttation event. In order to maintain proper drainage durug high snowmett or other <br />exceptional events, the culverts in undisturbed areas were sized at eighteen (18) inches diameter. <br />Table 4.8-1 presents the culvert sizing infornetion for existing and future haul road culverts. Table 4.8-1 a <br />lists most non-haul road and au>aliary a,hrerts to ideMiry and quantify adverts within the active mining <br />and reclamation area. Premine culverts installed outside of Trapper's active mining area are not shown in <br />perntt tables or on the M51 maps. <br />• The locations of all required culverts listed in both tables are shown on the Drainage end Sediment Con- <br />trol Map (M-51). Actual future culvert loa3tbns may vary from those sham on Map M51. If so, the pro- <br />axiures described in this sedion will be followed to ensure proper haul road culvert sizing and drainage <br />continuity. <br />Normal mining operations and weather conditions may require addttional culvert installations within pit <br />areas (inctudes associated spoils) to provide environmentally sound aa~ss coridors across drainage <br />poirrLs or to divert runoff to existing dreinageways. Culverts established wihin pit areas (often temporary <br />installations for a short period of time) will not be shown on Tables 4.&1, 4.8-1 a, or M51 map and will not <br />require Division approval prior to installation. Culverts established in these areas will be considered a <br />Best Technology Curtentry Available (BTCA) predice wtth the intent of mrtrim¢ing erosional Impacts to <br />Trapper's surtaaa water hydrology. <br />'4-'ii'S <br />• P~-~I <br />_ __p~A~l~ 1995.._. <br />