r ~ <br />• • <br />~t4arch?7. /997 <br />6. The grading on the lower bench will be done [o capture and prevent all flows from following [he <br />asphalt en¢ance road. The Flows will be routed to the eazt on an abandoned bench road that <br />intersects a rock cut on a cut face along the asphalt en¢ance road. All flows from the lower <br />bench will be routed [o this gap and allowed to fall down the rock face to the entrance road. A <br />small splash pad of large derrick stones will be placed adjacent to the entrance road to still the <br />water falling over the gap and allow i[ to sheet flow onto the entrance road. <br />7. A small sediment pond (LB3) located below the rock gap will con¢o1 flows from Bazin H. This <br />basin is relatively undisturbed and will not contribute much sediment. <br />8. There is a minor drainage ditch running along the entrance road to the mouth of the quarry. It is <br />only good for conveying minor nuisance flows. No further improvements will be made to this <br />ditch. Larger event flows will be allowed to sheet flow down the entrance road to the mouth of <br />the quarry. An asphalt swale approximately I.5 feet in height will be constructed to capture and <br />convey the Flows across the road into the lower sediment pond located at the mouth of the <br />quarry. <br />9. The sediment pond at the mouth of the quarry will be regraded, vegetation removed and a small <br />rock spillway installed. This pond was agreed to be ineffectual in terms of size. <br />10. Significant changes N the design flows have been achieved from the initial submittal. The <br />increase in sediment pond size and a retook at basin characteristics hazed on the field trip <br />justified modifying the model. We also changed the modeling program and used SEDCAD for <br />the final computer runs. <br />I I . The dimensions of the spillways and culverts proposed for each sediment pond are outlined in <br />both the plan and the computer output that is attached. The details of the spillway would remain <br />the same az the previous submittal. <br />12. The asphalt entrance road will have some minor ditch regrading to capture nuisance flows. The <br />road will also be patched to remove cracks that could contribute to unstable slopes along the <br />entrance road. Some grading and berming will also be done to repa¢ this unstable slope. <br />We are N the process of preparing large scale plans to be used by Western Mobile for cons¢uction N <br />the field. They will reflect the same items discussed above. If you have any questions, please do not <br />hesitate to call. <br />