Laserfiche WebLink
The motivation for this proposal results from the consistency of water quality sampling <br />parameters as defined in our yearly hydrology report to the Division. Additionally, <br />Hydroengineering makes the same recommendations on page 7-1 (enclosed) in their <br />1990 Annual Hydrology Report (Section 2.5 of this report). Ash monitoring and GLux-1 <br />wells will continue to be sampled quarterly. Quarterly monitoring of water levels will <br />continue for all appropriate wells. Permit pages 4-247a, 4-247b, 4-247c and 4-247d are <br />revised to reflect this change. <br /> <br /> <br />