My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120124
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:59 PM
Creation date
11/25/2007 8:14:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977310
IBM Index Class Name
Permit File
Doc Date
9/30/1977
Doc Name
LIMITED IMPACT AND SPECIAL TEN DAY PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXIiIBIT E - RECLAMATION PLAN <br />'TYPE OF RECLAMATION <br />Because two different groups of claims are mined out of <br />one adit, using essentially the same surface area, the <br />affected acreage has been divided between Cotter Corporation <br />and the other party, Kelmine Corporation, for purposes <br />of reclamation. <br />Using a Caterpillar D-7, or other appropriate equipment, <br />the waste dump will be graded into the existing hillside, <br />extending the toe of the hill out as far as necessary <br />without impairing existing drainage. Compacted areas <br />will be scarified. (See Exhibit A for breakdown of <br />affected acreage). <br />LAND USE <br />The JD-6 area is zoned agricultural-open by the Montrose <br />County Planning Department, permitting mining operations <br />as a use by right. At present the use is multiple-purpose: <br />mining, wildlife habitat, and winter rangeland. In the <br />foreseeable future, postmining land use will be the same. <br />• RECLAMATION PERFORMANCE STANDARDS <br />Grading <br />Grading will be carried on so. as to create a final topography <br />appropriate for future mining, wildlife habitat, and use <br />as winter rangeland. Slopes will approximate a 2:1 grade <br />and will not exceed the natural angle of repose of the <br />waste material. Backfilling and grading will be completed _ <br />as soon as feasible after the mining process which is <br />currently projected to be fifteen to twenty years from <br />now. All refuse will be hauled away from the mine site. <br />Drill sites will be plugged with a device approved by the <br />Bureau of Land Management.. Cuttings piles will be buried <br />and/or spread 'thin and revegetated. Adits and shafts will <br />be sealed permanently providing conditions stipulated in <br />the lease agreement are satisfied. <br />Water <br />Because no surface water is affected and the water encountered <br />underground from the perched water bodies is not brought <br />to the surface, statements in this section are not applicable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.