Laserfiche WebLink
• ATTACHMENT 13-10 <br />TABLE OF CONTENTS <br />Page <br />Introduction 13 10-1 <br />Time Frame of Move 13.10-1 <br />Construction Activities 13-10-1 <br />Dragline Movement 13-30-3 <br />Sediment Control 13-10-5 <br />Reclamation 13-10.5 <br />Conclusion 13.10-6 <br />Actual Dragline Move 13.10.6 <br />Revised Reclamation Schedule and Plans 13-10.6 <br />Table 1 Cut/Pill Volumes Under Powerline 13-10-4 <br />. Pigure 1 Temporary Topsoil Stockpile Location 13-10.8 <br />Fiqure 2 Turnout Exietinq Topography Map Pocket <br />Pigure 3 Turnout Regrading Plan Map Pocket <br />Figure 4 Turnout Regrading Cross Sec [ions Map Pocket <br />Addendum 13-10A Temporary Diversion Design, SEDCAD+ (Input and Output) <br />Addendum 13-10H Reclaimed Drainage Channel, SEDCAD+ (Input and Output) <br />Addendum 13-lOC Channel from Hallenbeck Stockpond to Culvert YA-1, SEDCAD+ <br />(Input and Ou [put) <br />LJ <br />Revised 05/12/97 <br />