Laserfiche WebLink
<br />MLRB PERMIT APPLICATION EXHIBIT A <br />SN Exhibit D-Reclamation Plan <br /> D-1.0 Definition of Reclamation 23 <br /> D-2.0 Near Term Reclamation Measures 23 <br /> D-3.0 Primary Reclamation Plan 24 <br /> D-4.0 Alternate Reclamation Plan 24 <br /> D-4.1 Erosion Control and Structure Removal 25 <br /> D-4.2 Growth Medium 25 <br /> D-4.3 Revegetation 26 <br /> TABLE 2. SEED MIX 27 <br /> D-4.4 Fertilization 27 <br /> D-4.5 Seedbed Preparation, Mulching, Planting Times 28 <br /> D-4.6 Site Specific Reclamation 28 <br /> No. 3 Tunnel Portal 28 <br /> No. 2 Tunnel Portal and Clark Tunnel 28 <br /> Main Mine Bench 29 <br /> D-4.7 Altemate Reclamation Plan Costs 29 <br /> Shaft Capping 29 <br /> Growth Medium 30 <br /> SPREADSHEET 1. GROWTH MEDIUM (PER ACRE) 3O <br /> Seed Mix 31 <br /> SPREADSHEET 2. SEED MIX 3I <br /> Revegetation Costs 31 <br /> SPREADSHEET 3. REVEGETATION (PER ACRE) 32 <br /> Ripping 32 <br /> SPREADSHEET 4. RIPPING (24" DEPTHt) 32 <br /> Site Specific and Total Reclamation Costs 33 <br /> SPREADSHEET 5. SITE SPECIFIC & TOTAL RECLAMATION <br /> COSTS 33 <br />SN Exhibit E -Mining/Reclamation Map (pocket) 34 <br />Su Exhibit F-List of Other Permits and Licenses Required 35 <br />S ^~ Exhibit G -Source of Legal Right-to-Enter 37 <br />S'~ Exhibit H-Municipalities Within aTwo-mile Radius 38 <br />S*1 Exhibit I - Proof of Filing with County Clerk 39 <br />Sal Exhibit J - Proof of Mailing Notices of Permit Application 40 <br /> References 42 <br />EXHIBIT A <br />- 2 - SMUGGLER MME SITE <br />