Laserfiche WebLink
<br />EXHIBIT D <br />MINING PLAN <br />This pit is a little more or less 20 acres. The depth of gravel is <br />approximately 8 ft. in depth and 2 ft. to 4 ft. of topsoil. <br />There is no water present in this pit, surface or subsurface. Surface <br />water will flow West and North. <br />41e plan to start on the 41est end, working to the East, and sloping <br />it to the Idest. The material 3/4 + or - will be stockpiled on the lower <br />level. The topsoil will be worked into the mined area. <br />There is an existing road to the pit area off of county road No. 55, and <br />will be used for the haul road. <br />