Laserfiche WebLink
<br />DIVISION OF MINERALS AND GEOLOGY <br />DeNdh nlCnt ul NdlIr LII N~•~urnt Ct <br />131 J Shcnn,ln \1., hunm ~ I ". <br />DenvCr, Cirh udJn 1111_'111 <br />Phunc: 13071 Hbe Iib' <br />FAX: (3031 N t'.!I I lug <br />October 30, 1995 <br /> <br />OF COLORADO <br />c~re-rr <br />III IIIIIIIIIIIII III J <br />999 <br />Mr. R.L. Farmer <br />Farmer Construction Inc. <br />P.0. Box 115 <br />Redvale, CO 81431 <br />Re: M-95-038, Spor Pit, Permit Issuance <br />Dear Mr. Farmer: <br />~~ <br />DEPAKTMEfVT Of= <br />NATURAL <br />RESOURCES <br />Rny Rumer <br />Grncrnor <br />Ia me~S Loc hhrad <br />Execuiur Ducnur <br />Mn harl H Lung <br />Dlc I n Dlmclur <br />On October 30, 1995, the Division of Minerals and Geology found Farmers <br />Construction Inc. to have satisfied the applicable requirements of <br />C.R.S. 34-32-101 et se for obtaining a mining and reclamation permit. <br />Therefore, a permit is being issued. Two signed originals of the permit have <br />been executed. We have kept one copy for our files and are enclosing one copy <br />for your use. Please read the terms of the permit. It is your responsibility <br />to comply with all of the terms of the permit. As a reminder, here are a few <br />things we feel are important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.10 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule l.ll to Conversions. <br />3. On your permit anniversary date each year, October 30, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />$225.00. Please consult Rule 1.15 for 110 and 112 Permits, and Statute <br />Section 34-32-116(1)(a) for 111 Permits, for the specific annual report <br />requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely, <br />a. `rrl~~ <br />_~MICHAEL B. LONG <br />1 Division Director <br />Enclosures <br />cc: Sherri Ross <br />MBL/JD/amm/4280G <br />