Laserfiche WebLink
i <br />,. _ ,-' <br />`~ <br />SPECIAL STIPULATIONS <br />FREMONT COUNTY DEADRORSE GRAVEL PIT <br />T 19 S. R 72 W. SEC 32. TR 47 <br />a) The final pit walls will be recontoured to a slope of 3:1 <br />(H:V) or lower, with the possible exception of the south wall, where <br />resistant bedrock may force a highwall. This south wall will be benched or <br />backfilled with material so that a slope as least as low as 2:1 (H:V) can <br />be achieved, <br />b) A ditch and/or berm will be maintained along the south and <br />east side of the haul road to divert surface drainage from the Glen vista <br />Gravel Pit which lies to the south of this proposed site. <br />c) Stockpiled topsoil will be spread over the pit area to a depth <br />of six inches. Some soil may have to be reconstructed from available <br />materials on or near the site, as described in the Reclamation Plan <br />suggested by the Soil Conservation Service, included in the Mining Plan. <br />d) Using an excavator, or similar equipment, the haul road will <br />be recontoured as close as possible to the original land slope, but leaving <br />the surface somewhat rough and porous, <br />e) The pit and haul road areas will be prepared, fertilized, <br />mulched and reseeded as outlined in the SCS Reclamation Plan, which was <br />submitted as part of the Mining Plan. <br />f) Upon final reclamation, if stormwater infiltration within the <br />pit is not rapid enough to prevent the formation of permanent mud areas, <br />positive drainage must be provided to the north into the natural water- <br />course. Conditions must be present for vegetation to re-establish <br />everywhere within the pit area. <br />