Laserfiche WebLink
LIST OF ATTACHMENTS • <br />Attachment No. <br />20-1 Reclaimed Drainage Calculations <br />LIST OF EXHIBITS <br />Exhibit No <br />20-1 Five-Year Permit Area Disturbance Map <br />20-1A Five-Year Permit Area Disturbance Map III-W Southl <br />20-2 Postmining Topography <br />20-2A Postmining Topography III-W Southl <br />20-3 Post Disturbance Topography - TAHR <br />20-4.1 Pre and Postmining Slopes Cross Section S-1 <br />20-4.2 Pre and Postmining Slopes Cross Sections 5-2 and S-3 <br />20-4.3 Pre and Postmining Slopes Cross Sections S-4, S-5, and S-6 <br />20-4.4 Pre and Postmining Slopes Cross Sections N-1 and N-2 <br />20-4.5 Pre and Postmining Slopes Cross-Sections II-W South <br />20-5.1 006 Channel Proiiles <br />20-5.2 (Replaced by 20.5.1) • <br />20-5.3 (Replaced by 20-5.1) <br />20-5.4 (Replaced by 20-5.1) <br />20-5.5 (Replaced by 20-5.11 <br />20-5.6 Postmining Stream Channels 005-E1 <br />20-5.7 Postmining Stream Channels 005-Gulch <br />20-5.8 (Replaced by 20-5.11 <br />20-5.9 Postmining Channels Profiles II-W South <br /> • <br />TR-45 ii Revised 10/04 <br />