Laserfiche WebLink
2.0 Summary of Known or Potential Waste Streams and Proposed Management <br />Prior investigations or visual observations near or in the gravel lease azea revealed the <br />presence of hydrocarbon constituents (benzene) in groundwater in the azea of Oxidation <br />Ponds 1-3; free product (degraded distillate) on the water table in the vicinity of WP-3; <br />stained soils in Oxidation Pond No 1 and the adjacent ditch to the north; a possible <br />asbestos landfill neaz the northernmost corner of the gravel lease azea that also shows <br />evidence of disposal (landfilling) of solid waste. Figure 1 shows the locations of these <br />azeas. Previous sampling locations and analytical laboratory results in the proposed <br />gravel mining azea are presented in the SCP. <br />In addition, the results of the SCP for Subazea 3 revealed the presence of free product in <br />MW-2 and high TPH concentrations in the overburden soil north of Evaporation Pond <br />No. 9. These results aze presented in the Soil Chazacterization Data for Evaporation <br />Pond No. 9 (October 29, 2001) and associated analytical reports. A sepazate plan for the <br />management and disposal of these hydrocazbon-impacted soils during mining is detailed <br />in Appendix A. <br />Subsequently, four additional monitoring wells (MW-4 through MW-7) were installed to <br />define the downgradient extent of free product present in wells MW-2 and WP-3 (Figure <br />2). MW-4 was installed approximately 200 feet southwest of MW-2 and based on April <br />2003 data, contains about 4 inches of product on the water table. No product was detected <br />in MW-6, installed approximately 200 feet southwest of MW-4. Thus, the southern extent <br />of product has been defined to be somewhere between MW-4 and MW-6. Well WP-3 <br />also contains about 4 inches of product. Wells MW-5 and MW-7, installed downgradient <br />of WP-3, do not contain product. <br />To reduce the risk of mobilizing the free product present to the north during pumping of <br />groundwater during mining, the mining plan has incorporated the installation of two <br />trenches (Trenches 1 and 2, Figure 2). These trenches will be dug 5 feet below normal <br />groundwater levels and filled with water to provide a positive hydraulic gradient against <br />the groundwater to the north to keep any contamination from entering the mining pit azea. <br />The trenches will be maintained for the life of the mining azea. Construction and <br />operation details for the trenches aze included in the Gilsonite Pit Permit Application. <br />A potential asbestos dump azea is also present in the northern portion of the mining <br />permit area (Figure 2). A 200-foot buffer will be surveyed, staked and maintained azound <br />this dump area, and no mining, excavation or other intrusive activity will take place <br />within this buffer zone. The dump azea is within the Staging Area for the mining <br />operations that will also be covered with approximately 3 feet of clean overburden to <br />provide a safe working azea that can also be later used as an industrial site. <br />Table 1 summarizes waste streams and appropriate management strategies. <br />