Laserfiche WebLink
sheet 1 of 2 <br />Task # <br />Date <br />User <br />CIRCES Cost Estimatinst Software <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />194 State :Colorado Permiffjob # : C-80-007 <br />01/08/2007 <br />TAK <br />Abbreviation :none <br />Filename :0007-194 <br />Permit or other job action :Permit Renewal Rn-05 <br />Task description :Replace topsoil from stockpile fo ROM pad expansion <br />.: <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />Description <br />Cost Bre <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape/2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cost/hour : $103.51 NA NA NA NA NA <br />OperatingcosUhour: $161.32 NA NA NA NA NA <br />Ripper op. cosUhour : NA NA NA NA NA NA <br />OperatorcosUhour: $24.95 NA NA NA NA NA <br />Unit subtotals : $289.78 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $579.56 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $579.56 <br />_...... <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 6,000 BCY factor: 1.250 volume: 7,500 LCY <br />County :Gunnison <br />Site :West Elk Mine <br />Source of quantity take-off : MR-240 <br />Source of estimated swell factor :CAT Handbook <br />