Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 183 <br />Date : 09/20/2006 <br />User : TAK <br />Permit/job# : C-80-00T <br />Abbreviation :none <br />Filename :0007-183 <br />Agency or organization name : CDRMS <br />Permit or otherjob action :Regrade <br />Task description : Replace <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 412 <br />State :Colorado <br />County :Gunnison <br />Site :West Elk Mine <br />mud pits associated with MR-212 <br />fopsoil from stockpile fo roads and <br />Basic machine :Cat D9R - 9SU (2005) <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cost/hour <br />Operating cosUhour <br />Ripper op.cosUhour <br />Operator cosUhour <br />Total unit cosVhour <br />Utilization °f° <br />$72.92 NA <br />$98.84 100 <br />$0.00 0 <br />$32.78 NA <br />9-17 <br />Horsepower: 405 <br />Shift basis : t perday <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$204.53 Total fleet cosUhour <br />$818.13 <br />Swell Loose <br />BCY factor: 1.250 volume: 515 LCY <br />Source of estimated volume :Page Z.OS-53 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCYIhr <br />Material consistency description <br />Consolidated stockoile <br />Average push gradient : 2.00 % p <br />Average site altitude : 6,700 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.05 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blada type : 1.00 <br />Net correction : 0.47 <br />Adjusted unit production : 991.51 LCYIhr <br />Adjusted fleet production : 3,966.05 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 0.13 Hours <br />Unit cost : $0.206 ILCY Total job cost : $106 <br />