Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatinla Software <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />182 State :Colorado PermiUjob # : C-80-007 <br />01/08/2007 Counry:Gunnison Abbreviation :none <br />TAK Site :West Elk Mine Filename :0007-182 <br />Permit or other job action :Permit Renewal Rn-05 <br />Task description :Replace topsoil from stockpile to CSLY-4 excavation <br />.. <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :ICat 637G w/push-pull <br />-Push dozer-.NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cosUhour : $103.51 NA NA NA NA NA <br />Operating cosUhour : $161.32 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $289.78 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $579.56 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $579.56 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 333 BCY factor : 1.250 volume : 418 LCY <br />Source of quantity take-off :Operator estimate <br />Source of estimated swell factor :CAT Handbook <br />