Laserfiche WebLink
VOLUME II-B <br />• LIST OF EXHIBITS <br />8 Sediment Control Plan <br />8a Proposed Dewatering Facility Culvert Sizing <br />8b EMD Vent Fan Site SAE <br />8c EMD Dewatering Facility SAE <br />8c(1) EMD Treatment Pond Design <br />8d Escape Shaft/Light Duty Road Culvert Design <br />8e Pond E Design <br />8e(1) 8 Right & 7 Right Cross-Panel Grout Operations Pad SAE <br />8e(1)(a) Corral SAE 10 year/24 hour <br />8f CYCC Pond B -Stage Storage -Estimated <br />8g Sedimentation Pond C: Design and Certification <br />8h Hydrologic Evaluation of Sedimentation Ponds: A, D and G <br />8H(I) Montgomery Watson Evaluation of Pond D, 1999 <br />Si Sedimentation Pond F: Design and Certification <br />• 8j CYCC Pond G -Stage Storage <br />8k CYCC Fish Creek Borehole Pond -Stage Storage <br />81 Drill Pad Small Area Exemption <br />8m Refuse Disposal Pile Bench Channel <br />8n SEDCAD for Diversions: PDI, PD2, PD3, PD4 <br />8o Waste Water Treatment Facility Site Application and Approval <br />8p Plate 1 titled Sediment Ponds, Energy Mines No. 1 and No. 2 and Eckman Park <br />8q Pond T Certification <br />9 Aquifer Test Data (Confidential Appendix) <br />9a Ground Water Inflow into the Mine -EMD <br />9b 9 Right Gate Road Faulting <br />]0 Geochemical Analysis of Wadge Seam (Confidential Appendix) <br />11 Geochemical Analysis of Wadge Seam Overburden {Confidential Appendix) <br />12 Lithologic Core Logs (Confidential Appendix) <br />13 Ground Water Model Documentation (Confidential Appendix) <br />14 Hydrologic Monitoring Plan <br />15 Typical Pedon Descriptions <br />• 16 Soil Mapping Unit Descriptions <br />17 Letters of Regulatory Concurrence on Level of Detail of Required Wildlife Information <br />Permit Renewal No. 3 v <br />1 / 15/00 <br />