Laserfiche WebLink
OFFICE OF THE STATE ENGINEER <br />Division of Water Resources /A'otr L ~ ~Or~ <br />Department of Natural Resources ! t'1 V U~ <br />~jj/ ~L%ltl' <br />OF COLORADO <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 ,.rU ®irision ~f Minerals and Geeto~y <br />Phone (303) 866-3581 / <br />FAx (3031 666-3589 r/ <br />www.watecstare.co.us Response to Reclamation Permit Application Consideration <br />DATE: November 3, 2005 <br />TO: Steve S. Shuey, Enviromnental Protection Specialist <br />oF'cOCo <br />~6 <br />«e <br />+ t <br />r <br />~ ra76 ~ <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CC: Division 4 Office; District QO Water Commissioner <br />FROM: Cynthia J. Love, Water Resource Engineer~~ <br />RE: Operator: Oldcastle SW Group, Inc. dba United Companies of Mesa County <br />Anderson Pit, File No. M-2005-021 <br />Section 8, Twp 15 S, Rng 95 W, 6th P.M., Delta County <br />Landowners- John Anderson, Teddie Graff, Will Hutchins <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />® The proposed operation vnll consume ground water by ®evaporation, ®dust control, ®reclamation, ®water <br />removed in the mined product, ®processing, ^other. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and dcetuttent the <br />locations of all wells within 600 feet rnile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the pemtit area or contact this office regarding the <br />600-foot spacing notification/heating process. <br />^ The proposed opem[ion may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for:uses a[ the permit site, -storage in the excavated <br />area(s). The applicant will need to provide evidence [o this office that the water is permitted or decreed for such <br />uses. <br />^ Other: <br />COMMENTS: The applicant submitted a Gravel Pit Well Permit Application to this office, but the application was <br />returned to the applicant pending review and approval of a Substitute Water Supply Plan (SWSP). The applicant also <br />submitted an S WSP request to this office. The plan is currently under review. If the plan is approved, the applicant will <br />be asked to resubmit the Well Permit Application to this office. <br />