Laserfiche WebLink
• measures at the coal crushing handling and loadout facilities have been approved by the <br />Colorado Department of Health, Air Pollution Control Division. <br />Colowyo maintains several azeas for coal storage near the shop facilities and also neaz the <br />Gossazd Loadout. Inactive storage piles have been sloped and compacted to prevent wind <br />erosion and spontaneous combustion. If coal dust becomes troublesome in the active coal <br />storage piles, a mobile water truck with a high pressure pump and nozzle is available for dust <br />suppression. <br />No thermal dryers aze used in the coal crushing and handling facilities. <br />Disturbance <br />Colowyo, in as much as practical, minimizes the azea of land disturbed at any one time. <br />Topsoil is removed only to the extent necessary to accommodate the mining operations. <br />Through the mine plan, the rehandling of both topsoil and overburden is kept to a minimum. <br />Reclamation of disturbed azeas will commence as contemporaneously as possible. <br />As necessary, mobile water truck will be assigned to work in topsoil or overburden removal <br />operations to keep any dusty conditions under control. Planting of special windbreak <br />vegetation in the permit azea is not planned. <br />Blasting <br />• Sequential blasting is utilized as a standazd practice to reduce the amount of unconfined <br />particulate matter produced. <br />Complete blasting information is set forth in Section 2.05.3 and Sections 4.08.1 through <br />4.08.6. <br />J <br />2.05-64 Revision Date: 1/26/05 <br />Revision No.: MR-69 <br />