My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119948
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:52 PM
Creation date
11/25/2007 7:58:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/11/2005
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• measures at the coal crushing handling and loadout facilities have been approved by the <br />Colorado Department of Health, Air Pollution Control Division. <br />Colowyo maintains several azeas for coal storage near the shop facilities and also neaz the <br />Gossazd Loadout. Inactive storage piles have been sloped and compacted to prevent wind <br />erosion and spontaneous combustion. If coal dust becomes troublesome in the active coal <br />storage piles, a mobile water truck with a high pressure pump and nozzle is available for dust <br />suppression. <br />No thermal dryers aze used in the coal crushing and handling facilities. <br />Disturbance <br />Colowyo, in as much as practical, minimizes the azea of land disturbed at any one time. <br />Topsoil is removed only to the extent necessary to accommodate the mining operations. <br />Through the mine plan, the rehandling of both topsoil and overburden is kept to a minimum. <br />Reclamation of disturbed azeas will commence as contemporaneously as possible. <br />As necessary, mobile water truck will be assigned to work in topsoil or overburden removal <br />operations to keep any dusty conditions under control. Planting of special windbreak <br />vegetation in the permit azea is not planned. <br />Blasting <br />• Sequential blasting is utilized as a standazd practice to reduce the amount of unconfined <br />particulate matter produced. <br />Complete blasting information is set forth in Section 2.05.3 and Sections 4.08.1 through <br />4.08.6. <br />J <br />2.05-64 Revision Date: 1/26/05 <br />Revision No.: MR-69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.