Laserfiche WebLink
'. <br /> <br />3) E~ISTLNG ROADS AS AFFECTED AREA <br />The existing roads to be utilized as access routes for the permit mining <br />activity are not to be substantially upgraded for this use. Surface use agreements <br />negotiated with the land surface owner, BLM, and provided ~+ith *Exhibit S <br />include only provision for normal maintenance grading and for replacing road <br />base material to rep serve the existing condition of the road base and surface <br />during permitted operations. The access route, including County Road Z 1, is not <br />to be included in the bonded "aj~ecred area" of this permit. <br />4) i4ILtiL~G UNITS <br />The enclosed *Exhibit C "Mining i4ap" has been here«ith modified to <br />clarify the ex-tent of all 16 indicated mining Units 1 through Xl•% The north- <br />south width dimension of all Units (except Unit XVI, at 190') is designated as <br />150 feet. East-west length dimensions however vary from X00 to 1950 feet <br />depending upon the extent of the deposited gravel resource. <br />5) DRAINAGE CH.~u\'NEL RECONSTRtiCTION <br />The intermittent drainage channel that traverses mining Units IX through XIII <br />shall be reconstructed at its approximate pre-mining location and outlet, featuring <br />a 10-foot .ride flat bottom ditch having 3-horizontal to 1-vertical re-vegetated <br />sideslopes. Re-vegetation of the stream bottom is demonstrated by the existing <br />situation to be impractical, and shall not be required nor attempted in the <br />reclamation phase of the operations. <br />The drainage channel slope run-down and 25 feet of the dow~ttstream channel at <br />the west excavation boundary, however shall be rip-rapped to protect that portion <br />of the channel from headwall erosion by the erosive forces of the higher velocity <br />stream flow incurred by the steeper stream gradient. Rip rap material shall be <br />provided from the larger screened cobble from pit operations. The outflow from <br />the replacement channel into the off-site natural channel shall be controlled by <br />silt fence and straw bale filtration dike, to control particulate bed-load of the <br />stream, as per the site's qualifying Stormwater Management Plan, until upslope <br />disturbed areas have been successfully re-vegetated. Certification under the <br />state-wide general Stormwater Permit shall be acquired, as required, before <br />mining Unrt IX. <br />6) DR4L1'AGE COtiTROL BERMS <br />Natural drainage f'or the majority of the entire site is practically non-existent <br />due to the spazse precipitation, the absence of a significant upslope watershed, <br />and the porous absorbing nature of the surface soils. Natural slopes are generally <br />west to east, beginning with the first eieht mining units sloping to the east- <br />southeast, and the remainder of the units sloping to the east-northeast. <br />