.. <br /> <br />OTHER PER~IITS <br />The arbitrary- compliance deadline of the Colorado Water Quality Control <br />Division aside, there is no requirement for state-wide general Stormwater Permit <br />certification until 30 days before occurrence of site disturbance activity resulting <br />in off-site stormwater discharge. Since the initial eight staged units of this <br />operation, comprising several years of operations, shall be internally drained with <br />no off-site discharge of surface water, a Stormwater Permit certification <br />application would be premature at this time. A qualifying stormwater <br />management plan has been developed, however, and incorporated into the <br />reclamation permit plans. <br />Equipment and site emission permit applications are also in the development <br />phase, and not yet available for release. <br />County land use and floodplain considerations have been verified in compliance <br />by Montezuma County Administrator, Thomas J. Weaver. Please see the <br />attached *letter of 22 December 1997. <br />The County Road " 21" approach is existing and current, except that the Road <br />Department has "requested that a borrow ditch 12-inch CMP culvert be installed <br />before hauling operations begin. <br />The requirements of listing other permits required in Exhibit 1•i have been fully <br />met. <br />PLEASE TELEPHO`+~ OR FAX ~ ff THERE ARE ADDITIONAL REQUIRE~NTS FOR <br />A COnu'~LETE t4~~ ACCEPTABLE APPLICATIOid FOR THIS PROPOSED OPERATIOiQ. <br />THA~~IK YOU FOR YOUR VALUABLE ASSISTANCE Ii`i THIS CRITICAL REVIEW. <br />Sincerely, <br />STONE GRAVEL PIT <br />by: Doug Con er, Geo o, st <br />Agent for Darer Stone <br />•enclosures <br />cc: file, D. Conger <br />Cop~.ea .to: D.bLG.- Denver (31 <br />