Laserfiche WebLink
• 2.05.3 <br />(3) <br />• <br />TR-30 <br />f~PPRovcl~ <br />3~z 3/a 9 <br />4. Benches <br />The proposed surface disturbance for the upper mine facilities includes the <br />construction of benches with related access roads. The first or upper is a utility <br />bench for a water tank, electrical substation and ventilation shaft and two fans. The <br />second bench or D-Seam portal bench is developed for an office, change house, <br />shop, warehouse, screen and crusher building, coal stockpile, reclaim tunnel, radial <br />stackers and other facilities. Portions of the portal bench will be utilized for material <br />storage and other mine facilities that are discussed in section 2.05.3(3). A small <br />bench along the haul road was constructed for the downhill conveyor transfer and <br />drive building. The B-Seam portal bench will be developed for a coal stockpile, <br />radial stacker and other facilities. Another bench was constructed along old State <br />Highway 133 for the coal stockpile, reclaim system and truck loadout. <br />5. Gob Piles <br />A gob pile was constructed east of the mine entrance below the old King Mine <br />portals beginning at the level of the old railroad track grade. The disturbance <br />associated with the gob pile includes clearing the area necessary to form the <br />boundary of the pile. Facilities associated with the gob pile include a topsoil <br />stockpile, cover fill stockpile, haul road and a sediment pond. Anew gob pile will <br />be constructed during 2004. tt is located approximately 1,500-feet east of the <br />existing gob pile. Facilities associated with the new gob pile include a topsoil <br />stockpile, cover fill stockpile, haul road and a sediment pond. <br />6. Unit Train Loadout <br />The disturbance associated with the unit train loadout is located south of the mine <br />along the Union Pacific mainline. A conveyor, new track and a batch weigh system <br />will be installed. Approximately 2,800 feet of mainline must be relocated so the lead <br />and parallel storage track can be constructed. The lead track is 8,240 feet long and <br />the storage track is 3,570 feet long. <br />Mine Facilities <br />The major surface facilities are located north of the North Fork of the Gunnison <br />River. The D-Seam mine portals are located about 800 feet above old State <br />Highway 133 at an elevation of approximately 6880 feet where the D-2 Seam <br />outcrops. The B-Seam mine portals will be located about 550 feet above old State <br />Highway 133 at an elevation of approximately 6630 feet. The loadout is located <br />along the mainline of the Union Pacific Railroad at an elevation of approximately <br />5880 feet. The surface facilities consist of sediment control structures, coal <br />handling facilities, unit train loadout, support facilities for mine operations and other <br />related facilities. <br />2.05-8- 11/03 <br />