• 2.05.3 <br /> Sediment pond K collects run-off from the batch weigh loadout and surrounding <br /> area. Pond K is a typical sediment pond, capable of containing the run-offfrom a 10- <br /> yearevent with a spillway system designed to handle the peak flow generated by the <br /> 25-year storm event. <br /> Sediment pond F collects run-off from the new gob disposal area. Pohd F is a <br /> fypica! sediment pond, capable of containing the run-off from a 10-year event with an <br /> emergency spillway system designed to handle the peak flow generated by the 25- <br /> yearstorm event. The initial sections of the emergency spillway are riprap plated <br /> open channels. Flow is conveyed over the fire Mountain Canal in a metal flume. <br /> Dewatering of Pond F will be by pumping through a buried 4-inch diameter primary <br /> spillway pipe that discharges into D-Gulch where fhe flow goes under SH-1336, over <br /> the Deer Trail Ditch and under the Fire Mountain Canal. <br />(i) General Drainage Plan <br />(i)(A) Sediment ponds B, C, J K, and F and the general drainage plan for the main site, <br /> loadout and new gob pile were prepared underthe direction of J. E. Stover, Colorado <br /> Professional Engineer, No.19230. Sediment pond D and the general drainage plan <br /> for the gob pile was prepared under the direction of Allan J. Breitenbach, Colorado <br /> Professional Engineer, No. 15247. <br />• <br />(i)(B) A description of the ponds is presented above. Detail drawings of ponds B, C, J, K <br /> and F are presented on Map Nos. 22-B, 22-C, 22-J, 22-K and Volume IX Figure 3 <br /> respectively: A detailed drawing of the gob pile sediment pond is presented in <br /> Volume 4, drawing 95266-04. <br />(i)(C) The preliminary hydrologic and geologic information required to assess the <br />hydrologic impact of the structure is presented in Volume III, Exhibit 8 for ponds B, C, <br />J & K, Volume IV, Appendices A and B for the refuse pile pohd and Volume IX, <br />Appendix B, for Pond F. <br />(i)(D) No underground mining has occurred under any of the sediment ponds and none is <br />anticipated. <br />(i)(E) Not applicable. <br />(ii) Detailed Design Plans <br />(ii)(A) Sediment ponds B, C, J, K and F and the drainage plan for the main site, loadout <br />and new gob pile were prepared under the direction of J. E. Stover, Colorado <br />Professional Engineer, No. 19230. Sediment pond D and the drainage plan forthe <br />gob pile was prepared under the direction of Allan J. Breitenbach, Colorado <br />• Professional Engineer, No. 15247. <br />TR- ~ 7 2.05 - 30 - 06/05 <br />/3 PPROV ~ <br />9 ~z6~o5 <br />