My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119918
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:52 PM
Creation date
11/25/2007 7:53:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
3/9/2007
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />• <br />1~ <br />TR-27 <br />/~~PRoVED <br />80~-103 <br />When rock or rocky material is used for embankment, placement shall be in <br />layers not exceeding the maximum size of the rock present, and in no case <br />shall lifts exceed 30 inches in depth. Rock layers shall be compacted by <br />routing the spreading equipment and loaded hauling equipment over the <br />entire width of the fill until compaction is obtained. <br />Temporary erosion control measures will be implemented during the <br />construction of the haul roads. Straw bales or other alternative <br />sedimentation control devices will be placed along the edge of the <br />embankments. After construction is complete the area disturbed will be <br />seeded and mulched to reduce the rate and volume of run-off. <br />A typical haul road section is shown on Map HR-1, Haul Road Sections, <br />presented in Volume V. Maps 52-1-011 through 52-1-014, presented in <br />Volume V, show plan and profile views of this haul road segment. <br />Drainage <br />The drainage design for the haul road includes ditches, ditch relief drains <br />and culverts as shown on the Drainage Plans, Maps 21-1 and 21-2. Volume <br />III, Exhibit 8, Protection of the Hydrologic Balance, presents the run-off <br />calculations based on the 10-year, 24-hour precipitation event. The ditch <br />and culvert sizes are presented in Exhibit 8 and on Maps 22-B, 22-C, 22-J <br />and 22-K. <br />Culverts are designed in accordance with the Handbook of Steel Drainage <br />& Highway Construction Products (1983). According to table HC-1, page <br />126, the minimum depth of cover for corrugated steel pipe, H-20 live load, 2 <br />2/3 X 1/2 inch corrugations is 12-inches for diameters or spans of 12 to 96 <br />inches. The depth of cover is measured from the top of pipe to the top of <br />subgrade. Therefore all culverts will be covered by compacted fill to a <br />minimum depth of 1 foot. <br />The inlet end of all culverts will be protected by an end section or a rock or <br />concrete headwall. <br />2.05 - 21 - 8/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.