My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE119858
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE119858
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:18:50 PM
Creation date
11/25/2007 7:48:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993041
IBM Index Class Name
Permit File
Doc Date
2/8/1994
Doc Name
DOWE FLATS QUARRY FN M-93-041 112 APPLICATION SECOND ADEQUACY LETTER
From
DMG
To
SHB AGRA INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,~ <br /> <br />in the reclamation plan (i.e. tandem scrapers, scraper-dozer <br />combination, etc.). It is indicated that material movement and <br />placement can be accomplished at $.40/cu.yd. This seems a bit <br />low if the Division has to bid and hire a contractor to do the <br />job. Would the actual Division cost be closer to $.50/cu.yd.? <br />The operator will also need to add 15.8 $ indirect and <br />administrative costs to the total reclamation cost estimate. <br />6. In addressing the Division's question concerning whether the <br />southern water bodies can hold all of the water inflow from the <br />north, it is stated that the hydrologic condition of the <br />reclaimed pit was evaluated by numerical simulation using the <br />"MODFLOW" model. Please provide the data for the model for <br />Division review. <br />To adequately review your response to the adequacy review, <br />Division must receive the required information by February 16, <br />1994. If we do not receive the required information by that date, <br />a new date may be set for consideration of the application as <br />provided for under Rule 1.5(2). Also, as provided for in Rule <br />1.5.1 all changes and additions to the permit application must be <br />filed with the Division, and with the County Clerk and Recorder. <br />The applicant shall also provide the Division with an affidavit or <br />receipt demonstrating that the change was filed with the County <br />Clerk and Recorder no later than the close of business on the day <br />the change was filed with the Division. Any change or addition to <br />an application shall constitute an amended filing for purposes of <br />determining the date for the consideration of the application by <br />the Division, and for the deadline for the final decision on the <br />application. Within five (5) working days of an amended filing, <br />the Division shall set a new date for the consideration of the <br />application. <br />If you are unable to fully respond to this letter, providing all <br />required information prior to the scheduled Board consideration <br />date of February 23, 1994, please contact me requesting a <br />continuance of Board consideration to a later date. <br />Since ly, <br />William C. York- eirn <br />Environmental Protection Specialist <br />cc: John Lohr, Southwestern Portland Cement <br />Rob Helmick, Boulder County Planning Department <br />Cliff Meyers, Boulder County Health Department <br />Carl Mount, DMG <br />c:\wp51\Dowe.adq <br />
The URL can be used to link to this page
Your browser does not support the video tag.