Laserfiche WebLink
• <br />EXHIBIT L <br />RECLAMATION COSTS <br />Due to the type of proposed reclamation, the site conditions, and final <br />land use, the costs of reclamation are expected to be minimal. Good <br />management and control during the mining operation by the County Engineer <br />will minimize the expense to Weld County, <br />Reclamation costs are estimated to be as follows: <br />Site preparation $50.00/Acre <br />Ferti]ization, Seed & Planting $200.00 <br />Mulch $100.00 <br />350.00/Acre <br />Total Cost = 36.5 Acres X $350.00 = $12,775.00 <br />C~ <br />C~ <br />The attached letter guarantees reclamation of the site try Weld County. <br />27 <br />EXHIBIT L <br />