Laserfiche WebLink
Spillway Discharge <br />East Buzzard Pond ~1R <br />Principal Emergency Total <br />Stage Spillway Spillway Discharge <br />(ft) (cfs) (cfs) (cfs) <br />6.0 0.00 0.00 0.00 <br />6.5 1.37 0.00 1.37 <br />7.0 8.70 0.00 8.70 <br />7.5 25.65 0.00 25.65 <br />8.0 55.24 0.00 55.24 <br />8.5 55.24 36.22 91.46 <br />9.0 55.24 119.45 174.69 <br />9.5 55.24 244.67 299.91 <br />10.0 55.24 412.38 467.62 <br />CRF/jb 4/57 <br />• <br />C~ <br />REVISED pPR 24'87 <br />